Answer:
the answer would be 135 meters
Step-by-step explanation:
If, to scale on a map, 1 centimeter is 3.5 meters, them 2 centimeters is 7 meters. so on and so forth until 30. 30 (centimeters) times 3.5 (meters) is 135. hope this helped!!!!! reply if this doesn't make sense
One JOB = 1 and 2 hours = 120 min
Tyler Rate per minute: 1/120 (in 1 minute he performes 1/120 of the job)
Dakota<span> Rate per minute: 1/90 (in 1 minute he performes 1/90 of the job)
Tyler's + Dakota's rate per 1 minute = 1/120 + 1/90 = 7/360 (Job/minutes)
7/360 of the job was performed in 1 minute
</span>a complete JOB =1 to be performed in x minutes (Rule of three)
x = 1x1/(7/360) that equals to 360/7 and x (time of both) = 51 min 42
The simple interest of $4,700 principal at 4% interest and 10 months is <u>$156.67</u> and its <u>maturity level</u> is <u>83%</u>.
<h3>What is simple interest?</h3>
Simple interest refers to the interest calculated only on the principal.
With the simple interest method, the borrower only pays interest on the principal without considering the previously-accumulated interests.
<h3>Data and Calculations:</h3>
Principal = $4,700
Interest rate = 4%
Period = 10 months
Simple interest = $156.67 ($4,700 x 4% x 10/12)
Thus, the simple interest of $4,700 principal at 4% interest and 10 months is <u>$156.67</u> and its <u>maturity level</u> is <u>83%</u>.
Learn more about simple interests at brainly.com/question/
Answer:
x + 3
Step-by-step explanation:
A 'sum' means addition, 'a number' is represented by a variable, in this case, I chose 'x'. I could have picked any variable I wanted.
The sum of three and a number means: three plus some number, which is
3 + x in math language. We write variables before constants, so it gets
rewritten as x + 3