Answer:
-16 1/2 =16.5
-33/2 =-16.5
so the answer is = cuz -16.5=-16.5
Step-by-step explanation:
Answer:
Type 2 error
Step-by-step explanation:
H0 : μ = 261
H0 : μ > 261
By failing to reject H0 ; when the it is false. This means accepting null hypothesis when it is actually FALSE. Then a type 2 error has been committed.
This is different from a type 1 error whereby the null hypothesis is rejected when it is actually TRUE.
Hence, by finding no evidence to reject the null hypothesis during statistical testing when the actual windspeed of an F5 tornado during statistical testing is actually greater than 261 mph.
As we look at the question Answer is :12x +15
Answer:b
Step-by-step explanation:
Answer:
Future Value= $17,170.12
Step-by-step explanation:
Giving the following information:
Monthly deposit (A)= $70
Interest rate (i)= 0.04/12= 0.0033
Number of periods (n)= 15*12= 180 months
<u>To calculate the future value (amount saved), we need to use the following formula:</u>
FV= {A*[(1+i)^n-1]}/i
A= monthly deposit
FV= {70*[(1.0033^180) - 1]} / 0.0033
FV= $17,170.12