Answer:
3m/s²
Explanation:
The slope on a velocity time graph represents the acceleration, so if you simply use the slope formula, you can find the acceleration between those two points.
m=rise/run
m=(60-15)/(20-5)
m=45/15
m=3 m/s ² squared (therefore this is your constant acceleration from those two points).
Answer:
vp = 0.94 m/s
Explanation
Formula
Vp = position/ time
position: Initial position - Final position
Position = 25 m - (-7 m) = 25 m + 7 m = 32 m
Then
Vp = 32 m / 34 seconds
Vp = 0.94 m/s
Answer:
Therefore the rate of corrosion 37.4 mpy and 0.952 mm/yr.
Explanation:
The corrosion rate is the rate of material remove.The formula for calculating CPR or corrosion penetration rate is

K= constant depends on the system of units used.
W= weight =485 g
D= density =7.9 g/cm³
A = exposed specimen area =100 in² =6.452 cm²
K=534 to give CPR in mpy
K=87.6 to give CPR in mm/yr
mpy


=37.4mpy
mm/yr


=0.952 mm/yr
Therefore the rate of corrosion 37.4 mpy and 0.952 mm/yr.
Answer:
<em>Ecologist</em><em>.</em>
<em> </em><em> </em><em> </em><em> </em><em> </em><em>Your</em><em> </em><em>answer </em><em>is</em><em> </em><em>Ecologist</em><em>.</em>