Well he earned $50 this week and $25 the following week, so 2/5 of $75 is $30
Answer:
Minimum cycle time = time for longest task = 2.4 minutes
Maximum cycle time = sum of the times to complete all the tasks = 18 minutes
Step-by-step explanation:
For the minimum cycle time, the reasoning is that all the tasks can be done simultaneously, at some during the assembling task. Hence, minimum time to complete one cycle is the time it takes to complete task that takes the longest time to complete.
For the maximum cycle time, the reasoning here is that each task is done after the completion of the previous task. The total time taken to finish the task will then be the sum of the time taken to complete each task. This usually is at the beginning of operations.
Answer:

Step-by-step explanation:
Let be "s" the length in meters of the short piece and "l" the lenght in meters of the long piece.
Set up a system of equations:

Apply the Substitution Method to solve the system. Substitute the second equation into the first equation and solve for "l":

Susbstitute the value of "l" into the second equation in order to find the value of "s". This is:

Step-by-step explanation:
this is a strange rental company charging no daily fees.
but ok.
so, we have a fixed part of the cost : $24
we have to pay that no matter how many miles we drive. even for 0 miles, just to get the keys to the car.
and then we pay $0.35 for every mile driven.
that makes our function
C(x) = 0.35x + 24
and if we drive 40 miles, that makes x = 40.
C(24) = 0.35×40 + 24 = 14 + 24 = $38
it would cost us $38.
Tan(35)=x/12
.7=x/12
12*.7=x
x=8.4