Answer:
19?
Step-by-step explanation:
double of 4 is 8, double of 1/2 is 1 and adding them all together is 19
Answer:
x=-2
Step-by-step explanation:
1/2(2-6x)-4(x+3/2)=-(x-3)+4
(1-3x)-4x-6=-x+3+4
-7x-5=-x+7
Tranpose
-7x+x=5+7
-6x=12
Divide by -6
x=-2
A is the correct answer 3 terms and a degree of 9:)
Answer: n = 14
Step-by-step explanation: margin of error = critical value × σ/√n
Where σ = population standard deviation = 1
n = sample size = ?
We are to construct a 99% confidence interval, hence the level of significance is 1%.
The critical value for 2 tailed test at 1% level of significance is gotten from a standard normal distribution table which is 2.58
Margin of error = 0.7
0.7 = 2.58×1/√n
0.7 = 2.58/√n
By cross multipying
0.7×√n = 2.58
By squaring both sides
0.7^2 × n = 2.58^2
0.49 × n = 6.6564
n = 6.6564/0.49
n = 14
Answer:
4 hours
Step-by-step explanation:
240÷60=4 hours