Answer: 10 customers.
Step-by-step explanation:
The formula to find the required sample size :
(1)
, where p= prior population proportion.
n= sample size.
= Population standard deviation from previous studies.
Let p be prior population proportion of the customers who click on ads on their smartphones .
As per given , we have
p=0.62
E= 0.27
For 92% confidence , significance level : 
The critical value of z for 92% confidence interval from z-table would be

Put theses values in the formula (1), we will get


Therefore , the company should survey 10 customers .
Answer:
think this one
Step-by-step explanation:
the answers there
i think
Question:
Howard is designing a chair swing ride. The swing ropes are 4 meters long, and in full swing they tilt in an angle of 23°. Howard wants the chairs to be 3.5 meters above the ground in full swing. How tall should the pole of the swing ride be? Round your final answer to the nearest hundredth.
Answer:
7.18 meters
Step-by-step explanation:
Given:
Length of rope, L = 4 m
Angle = 23°
Height of chair, H= 3.5 m
In this question, we are to asked to find the height of the pole of the swing ride.
Let X represent the height of the pole of the swing ride.
Let's first find the length of pole from the top of the swing ride. Thus, we have:

Substituting figures, we have:
Let's make h subject of the formula.

The length of pole from the top of the swing ride is 3.68 meters
To find the height of the pole of the swing ride, we have:
X = h + H
X = 3.68 + 3.5
X = 7.18
Height of the pole of the swing ride is 7.18 meters
Answer:
B. 85,000
Step-by-step explanation:
85 * 1000
= 85,000 mg.
Answer:
Final answer is ---> -4
Step-by-step explanation: