Answer:
Multiply the first bracket by 3
Multiply the second bracket by -2
3x+3=-2x+2-4
3x+2x+3=-2x-2 negative (-) number and positive number (+)= negative number
Just rearranging
5x+3=-2
5x+3-3=-2-3
5x=-5
Dividing by 5
5x/5=-5/5
x=-1
Check answer by using substitution method
3(-1+1)=-2(-1-1)-4
0=-2(-2)-4 negative number and negative number = positive number
0=4-4
0=0
Answer is x=-1
Answer:
ok ok ok ok ok ok o kom ko ko ko ko ko komk ko ko ko k kokok ok ok ok ok ok ok ok ok o-k ok ok
Step-by-step explanation:
The third term is 9
t(3)=2(3)+3
6+3 = 9
Answer:
0.1151 = 11.51% probability of completing the project over 20 days.
Step-by-step explanation:
Normal Probability Distribution
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Expected completion time of the project = 22 days.
Variance of project completion time = 2.77
This means that 
What is the probability of completing the project over 20 days?
This is the p-value of Z when X = 20, so:



has a p-value of 0.1151.
0.1151 = 11.51% probability of completing the project over 20 days.
Answer:
hypotenuse: x
opposite:z
adjacent:y
2nd
hypotenuse: x
opposite: y
adjacent:z
Step-by-step explanation:
hypotenuse: x
opposite:z
adjacent:y
2nd
hypotenuse: x
opposite: y
adjacent:z