1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Zinaida [17]
3 years ago
12

Complete the Point-Slope equation of (-8,-8) (-7,9)

Mathematics
1 answer:
Vadim26 [7]3 years ago
7 0

Answer:

y = 17x +128

Step-by-step explanation:

P1(-8,-8)

P2(-7,9)

Slope,

m = (y2-y1)/(x2-x1) = (9-(-8))/(-8-(-7)) = 17/(-1) = 17

The point-slope equation is

y-y1 = m(x+x1)

y-(-8) = 17(x-(-8))

y+8 = 17x + 136

y = 17x +128

You might be interested in
Solve for x: 3(x + 1) = −2(x − 1) − 4.
Vlad [161]

Answer:

Multiply the first bracket by 3

Multiply the second bracket by -2

3x+3=-2x+2-4

3x+2x+3=-2x-2   negative (-) number and positive number (+)= negative number

Just rearranging

5x+3=-2

5x+3-3=-2-3

5x=-5

Dividing by 5

5x/5=-5/5

x=-1

Check answer by using substitution method

3(-1+1)=-2(-1-1)-4

0=-2(-2)-4 negative number and negative number = positive number

0=4-4

0=0

Answer is x=-1

6 0
3 years ago
Find the point of intersection of each pair of lines using substitution
lyudmila [28]

Answer:

ok ok ok ok ok ok o kom ko ko ko ko ko komk ko ko ko k kokok ok ok ok ok ok ok ok ok o-k ok ok

Step-by-step explanation:

3 0
2 years ago
If t(n) 2n+3 what is the 3rd term
german
The third term is 9

t(3)=2(3)+3
6+3 = 9
3 0
3 years ago
Joe used a project management software package and has determined the following results for a given project.: Expected completio
statuscvo [17]

Answer:

0.1151 = 11.51% probability of completing the project over 20 days.

Step-by-step explanation:

Normal Probability Distribution

Problems of normal distributions can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the z-score of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.

Expected completion time of the project = 22 days.

Variance of project completion time = 2.77

This means that \mu = 22, \sigma = \sqrt{2.77}

What is the probability of completing the project over 20 days?

This is the p-value of Z when X = 20, so:

Z = \frac{X - \mu}{\sigma}

Z = \frac{20 - 22}{\sqrt{2.77}}

Z = -1.2

Z = -1.2 has a p-value of 0.1151.

0.1151 = 11.51% probability of completing the project over 20 days.

4 0
2 years ago
NEED THIS NOW PLS PLS PLS HELP
Tasya [4]

Answer:

hypotenuse: x

opposite:z

adjacent:y

2nd

hypotenuse: x

opposite: y

adjacent:z

Step-by-step explanation:

hypotenuse: x

opposite:z

adjacent:y

2nd

hypotenuse: x

opposite: y

adjacent:z

5 0
2 years ago
Other questions:
  • Would that he the answer or option A ?
    15·2 answers
  • Helpppp me pleaseeeee
    13·1 answer
  • Given the graph of a line y=−x. Write an equation of a line which is perpendicular and goes through the point (8,2).
    13·2 answers
  • ava took out a 30 year loan for 310000 at 2.3% interest compounded monthly if her monthly payment on the loan will remain 1192.8
    15·1 answer
  • Evaluate.<br><br> 52+7⋅3+4<br><br><br> 40<br><br> 50<br><br> 55<br><br> 224
    8·2 answers
  • PLEASEEE HELLPP FIND THE AREA
    7·1 answer
  • What is the answer to 3/8 x 8/9 ?
    10·1 answer
  • Item 6 Graph △JKL and its image after a reflection in the y-axis. J(5, 3), K(1,−2), L(−3, 4)
    6·1 answer
  • Write the following number in scientific notation: .00098
    5·1 answer
  • 3 2/3 of 4/5 of pizza equals how many pizza
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!