Answer:
Option C is the Correct Answer
Answer:
115
Step-by-step explanation:
180-50=130
130/2=65
180-65=115
Answer:
(-1,5)
Step-by-step explanation:
up the x corridor and down the y axis.
Answer:
For Company A to have a better deal, the truck must be driven more than 250 miles per day.
Step-by-step explanation:
Given that:
Rent per day of company A = $70
Per mile charges = $0.20
Let,
x be the number of miles.
A(x) = 0.20x + 70
Rent per day of company B = $20
Per mile charges = $0.40
B(x) = 0.40x + 20
For make Company A better deal,
A(x) > B(x)
0.20x+70 > 0.40+20
0.20x-0.40x>20-70
-0.20x>-50
Dividing both sides by -0.20
Hence,
For Company A to have a better deal, the truck must be driven more than 250 miles per day.
The things you can apply to complete this job is workers and time. The job being accomplished is painted walls. This problem defines two jobs. The rate for each of the jobs will be the same. The first job rate is: R=(7 wkr)•(42 min)/(6 walls)R= 49 wkr-min/walls or 49 worker-minutes per wall. This means one worker can paint one wall in 49 minutes. If you think about this job if 7 workers take 42 minutes to do 6 walls it will only take them 7 minutes to do one wall. And it will take one person 7 times as long to do a job as 7 people working together. This first job rate equals the second job rate R=(8 wkr)•(t )/(8 walls)R=1 t wkr/wall where t is the time to do the second job. Setting the two rates equal to each other and solving for t. t=49 minutes It makes sense if one worker can paint one wall in 49 minutes then 8 workers can paint 8 walls in the same time.