Answer:
a. 95.4
b. UCL = 96.07
LCL = 94.73
c. Process is in control
Step-by-step explanation:
a. The computation of estimate mean is shown below:-

= 95.4
b. The computation of Upper Control Limit (UCL) and the Lower Control Limit (LCL) for the manufacturing process is shown below:-


= 95.4 + 0.67082
= 96.07


= 95.4 - 0.67082
= 94.73
c. The explanation is shown below:-
From the above calculation we can see that the sample lies between LCL AND UCL that is (94.73 ,96.07) ,
The Process is in control
Answer:
The standard deviation for the sample mean distribution=0.603
Step-by-step explanation:
We are given that
Mean,
Standard deviation,
n=44
We have to find the standard deviation for the sample mean distribution using Central Limit Theorem for Means.
Standard deviation for the sample mean distribution

Using the formula





Hence, the standard deviation for the sample mean distribution=0.603
Answer:
Nice. What is the question?
Step-by-step explanation:
Answer:
15/56
Step-by-step explanation:
5/8 x 3/7 = (5x3)/(8x7) = 15/56
Hope it helps!
Answer:
8 celcius
Step-by-step explanation:
The slope is -8 so it is decreasing by 8