1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Elenna [48]
3 years ago
12

Suzy likes to mix and match her 3 necklaces, 2 bracelets, and 6 hats. The colors are listed in the table. On Monday, she random

ly picks a bracelet, a necklace, and a hat. What is the probability of Suzy choosing a red bracelet and silver hat?
Table:
Necklace: Red, Green, Gold
Bracelet: Red, Black
Hat: Silver, Yellow, Green, Gold, Black, White
PLEASE HELP FAST I NEED ANSWER ASAP!:(
Mathematics
1 answer:
Svetllana [295]3 years ago
7 0
Each one of the red, green, and gold necklace have a probability of 1/3.
Each one of the red and black bracelet have a probability of 1/2.
Each one of the silver, yellow, green, gold, black, and white hat have a probability of 1/6.

The probability of Suzy choosing a red bracelet and silver hat is solved by getting the probability of the red bracelet and silver hat which is computed by:
=1/2 * 1/6
= 1/12
The probability is 1/12.
You might be interested in
A(n) ______ specifies the phenomena of interest; indicates which variables are independent, alternative, antecedent, intervening
Nana76 [90]

Answer:

An arrow diagram

Step-by-step explanation:

Helps keep track of intricate relationships between variables. Specifies the phenomena of interest: independent, alternative, antecedent and intervening.

-Time on the bottom with an arrow

-Antecedent -> Independent -> intervening-> dependent

An arrow diagram is defined as a process diagramming tool used to determine optimal sequence of events, and their inter-connectivity. It  is a network diagramming technique in which activities are represented by arrow, used for scheduling and to determine the critical path through nodes. The arrow diagramming method shows the required order of tasks in a project or process, the best schedule for the entire project, and potential scheduling and resource problems and their solutions. The arrow diagram lets you calculate the "critical path" of the project the flow of critical steps where delays can affect the timing of the entire project and where addition of resources can speed up the project.

One headed arrow connecting two variables= "X directly causes Y"

5 0
3 years ago
Read 2 more answers
What is 4 1/2 - 5 1/4?
alekssr [168]

Answer:

Step-by-step explanation:

well its 4.5-5.25= -0.75

7 0
3 years ago
Read 2 more answers
WILL GIVE BRAINLY AND POINTS PLZZZ<br><br><br> Which linear function has a positive slope?
melamori03 [73]

Answer:

The third option has a linear slope.

Step-by-step explanation:

9 0
3 years ago
Read 2 more answers
Regular hexagon FGHIJK shares a common shares a common center with square ABCD on a coordinate plane .
timurjin [86]

Answer:

<h3>"The answer is the yellow lines in the attached figure. </h3>

Step-by-step explanation: As shown in the attached figure, regular hexagon FGHIJK and square ABCD shares common centre on the co-ordinate plane and AB || FG.

We are to find the line across which the combined figure will reflect onto itself.

In the attached figure, we see two lines which are yellow in colour. We can easily detect that the figure will be reflected onto itself if these two lines acts as a mirror separately.

Hence these yellow lines are the required lines."

<h3><u>Hope this helps!</u></h3>

6 0
3 years ago
A plumber charges $90 per hour and a $50 travel fee.
Fittoniya [83]
Okay so subtract 50 from both sides and you would get 360=90x and then divide each side by 90 and you would get x= 4 so it took 4 hours
8 0
4 years ago
Read 2 more answers
Other questions:
  • Point Q is equidistant from the sides of ∠TSR. Find m∠RST.
    9·1 answer
  • <img src="https://tex.z-dn.net/?f=%20-%201%20%2B%20%20-%202" id="TexFormula1" title=" - 1 + - 2" alt=" - 1 + - 2" align="absmi
    8·1 answer
  • What two pieces of information you need to know velocity
    8·2 answers
  • Select the correct answer
    10·1 answer
  • Six measurements were made of the magnesium ion concentration (in parts per million, or ppm) in a city's municipal water supply,
    8·1 answer
  • Evaluate the expression using order of operations 10 x (20 divided by 5)
    11·1 answer
  • The graph of a system of equations is shown below . What system of equations represents the graph ?
    11·1 answer
  • I just need help wit this quick question
    6·2 answers
  • N= A-b <br> solve for A <br> hurry plzzzzz
    5·2 answers
  • Help with khan academy
    8·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!