1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
fgiga [73]
3 years ago
8

From which tab can you format individual cell data like any other text? A.Design B. Home C. Table Tools Design D.Table Tools Lay

out
Computers and Technology
1 answer:
skelet666 [1.2K]3 years ago
6 0
The answer to this question is the letter "B" which is the HOME tab. When you click the home tab, you can find the different number format in such a way that you can also format the individual cell, it could be data of any other text.
You might be interested in
g A sign of thrashing is Group of answer choices the CPU utilization increases as the degree of multiprogramming is increased. t
Bezzdna [24]

Answer:

the CPU utilization decreases as the degree of multiprogramming is increased.

Explanation:

The fundamental concept is that allocating a process with too few frames causes too many and frequent page faults. This implies that the CPU does not perform any useful work and thus its utilization would decrease drastically. In this case, the long-term scheduler, in a bid to improve the utilization of the CPU, would load more processes into the memory so as to increase the extent of multiprogramming. As a result, there would be more decrease in the utilization of the CPU, leading to a chained reaction of higher page faults, which is then followed by a corresponding increase in the multiprogramming degree, usually known as thrashing.

8 0
3 years ago
Which of the following is true? Group of answer choices worst case time of Heapsort is better than worst cast time of Quicksort
Sav [38]

Answer:

Worst case time of Heapsort is better than worst case time of Quicksort.

Explanation:

Worstcase of Heapsort is nlog(n). Worstcase time of Quicksort is (n^2). Heapsort is comparison based sorting algorithm. Heapsort divides input into sorting. It is a selection sort in which we send maximum inputs for maximum elements at end. Quicksort is divide and conquer algorithm. It is considered as efficient sourcing algorithm.

8 0
3 years ago
What are your two biggest strengths as a student? How will these strengths help you become a self-directed learner?
zavuch27 [327]

Answer:

5tgggffyfghfh jrhrhek

7 0
3 years ago
Read 2 more answers
How do big organizations take back their data to be reviewed after a disaster?
Jet001 [13]
Here a 5 step recovery plan, I have been in IT for 8 years

1. Create a disaster recovery team.

The team will be responsible for developing, implementing, and maintaining the DRP. A DRP should identify the team members, define each member’s responsibilities, and provide their contact information. The DRP should also identify who should be contacted in the event of a disaster or emergency. All employees should be informed of and understand the DRP and their responsibility if a disaster occurs.

2. Identify and assess disaster risks.

Your disaster recovery team should identify and assess the risks to your organization. This step should include items related to natural disasters, man-made emergencies, and technology related incidents. This will assist the team in identifying the recovery strategies and resources required to recover from disasters within a predetermined and acceptable timeframe.

3. Determine critical applications, documents, and resources.

The organization must evaluate its business processes to determine which are critical to the operations of the organization. The plan should focus on short-term survivability, such as generating cash flows and revenues, rather than on a long term solution of restoring the organization’s full functioning capacity. However, the organization must recognize that there are some processes that should not be delayed if possible. One example of a critical process is the processing of payroll.

4. Specify backup and off-site storage procedures.

These procedures should identify what to back up, by whom, how to perform the backup, location of backup and how frequently backups should occur. All critical applications, equipment, and documents should be backed up. Documents that you should consider backing up are the latest financial statements, tax returns, a current list of employees and their contact information, inventory records, customer and vendor listings. Critical supplies required for daily operations, such as checks and purchase orders, as well as a copy of the DRP, should be stored at an off-site location.

5. Test and maintain the DRP.

Disaster recovery planning is a continual process as risks of disasters and emergencies are always changing. It is recommended that the organization routinely test the DRP to evaluate the procedures documented in the plan for effectiveness and appropriateness. The recovery team should regularly update the DRP to accommodate for changes in business processes, technology, and evolving disaster risks.



summary :an organization must develop a recovery team to create a disaster recovery plan that includes identifying and assessing disaster risks, determining critical applications, and specifying backup procedures. Other procedures may be included in the plan based on the organization. The recovery team and organization must then implement the DRP and follow through on the plan procedures. The DRP should be continually tested and maintained to consistently prepare the organization for evolving disasters and emergencies.
4 0
2 years ago
An administrator is writing into a database and received an error detailed in the exhibit. What two steps need to be taken to re
d1i1m1o1n [39]

An administrator is writing into a database and received an error detailed in the exhibit. The two steps to be taken to resolve this are :

Move the Execute SQL statement to be between Connect and Disconnect. Move the Prompt Message to be before the Disconnect statements.

Explanation:

  • Dynamic SQL refers to SQL statements that are generated at run-time.
  • To disconnect from a database, in the Database Navigator or Projects view, click the connection and then click the Disconnect button in the toolbar or click Database -> Disconnect on the main menu
  • You can also right-click the connection and click Disconnect on the context menu
  • The PROMPT command may be used to display messages to the user, perhaps supplying a short summary of what your script is going to accomplish.
  • The SQL EXECUTE command executes an SQL command and binds the result to 4D objects (arrays, variables or fields).
  • A valid connection must be specified in the current process in order to execute this command. The sqlStatement parameter contains the SQL command to execute.

7 0
3 years ago
Other questions:
  • What authentication protocol is ticket-based and is used by windows computers that are members of an active directory domain?
    13·1 answer
  • .The __________ comes in handy when I'm using Microsoft Word to type an essay with a specific word number requirement
    6·1 answer
  • The expressions in each part of an AND or OR expression use ________ evaluation; that is, they are evaluated only as much as nec
    9·1 answer
  • Select the correct answer.
    15·1 answer
  • is there an app i can use to make a picture appear in the corner of a video then disappear after being up for a second?
    6·2 answers
  • While (e &lt; 10):<br> print (c)
    10·1 answer
  • Help plz
    10·1 answer
  • Borrowing money affects both assests and owners equity. True or false?​
    13·1 answer
  • How do we store value in a variable? Give an example
    15·1 answer
  • What are some advantages to having ads tailored to your data?
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!