I think the answer to this question is 18
Answer:
2.4 hours
Step-by-step explanation:
Let total work = X
Rate of work done = X ÷ time
Rate of A = X/4
Rate of B = X/6
If they work together, rate is the sum of their individual rates, i.e.
X/4 + X/6
= (3X + 2X)/12 (taking LCM)
=5X/12
Rate = X/time
5X/12 = X/time
time = X÷(5X/12)
time = X × 12/(5X)
time = 2.4 hours
Shortcut:
Product of individual times/sum of individual times
= (4×6)/(4+6)
=24/10
=2.4 hours
Answer:
Step-by-step explanation:
D because it shows that 1x1/3 is shown on # D
12x=x^2-64
you have to do quadratic formula
<u>Answer:</u>
x = -3/7
<u>Step-by-step explanation:</u>
We are given the following equation for which we have to solve for x:

So we will start by expanding the equation by multiplying the common factor with the brackets to get:

Arranging the like terms together (variables on one side of the equation and constants on the other side) to get:

Therefore, x = -3/7.