1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
tresset_1 [31]
3 years ago
7

0.6701 rounded to the nearest hundredth

Mathematics
2 answers:
Ratling [72]3 years ago
5 0

Answer:

0.67

Step-by-step explanation:

Find the number in the hundredth place  

7

and look one place to the right for the rounding digit  

0

. Round up if this number is greater than or equal to  

5

and round down if it is less than  

5

.

Anit [1.1K]3 years ago
3 0

Answer:

Your answer would be 0.67

Step-by-step explanation:

You might be interested in
Graph a line with a y-intercept of -3 and a slope of 1/2
OleMash [197]

Answer:

A

Step-by-step explanation:

(0,-3), (2,-2), (4, -1), (6,0) are on the line and (6, 0) is A

4 0
2 years ago
A cleaning solution is made from vinegar, lemon juice, and water. The table below shows the part of the total solution that is i
Natali [406]

Answer:

30 ml (c)

Step-by-step explanation:

6 0
2 years ago
Read 2 more answers
Darcie wants to crochet a minimum of 3 blankets to donate to a homeless shelter. Darcie crochets at a rate of 1/15 blanket per d
Sauron [17]

Answer:

Since Darcie wants to crochet a minimum of 3 blankets and she crochets at a rate of 1/5 blanket per day, we can determine how many days she will need to crochet a minimum of 3 blankets following the next steps:

- Finding the number of days needed to crochet one (1) blanket:

\begin{gathered}1=\frac{1}{5}Crochet(Day)\\Crochet(Day)=5*1=5\end{gathered}

1=

5

1

Crochet(Day)

Crochet(Day)=5∗1=5

So, she can crochet 1 blanket every 5 days.

- Finding the number of days needed to crochet three (3) blankets:

If she needs 5 days to crochet 1 blanket, to crochet 3 blankets she will need 15 days because:

\begin{gathered}DaysNeeded=\frac{NumberOfBlankets}{Rate}\\\\DaysNeeded=\frac{3}{\frac{1}{5}}=3*5=15\end{gathered}

DaysNeeded=

Rate

NumberOfBlankets

DaysNeeded=

5

1

3

=3∗5=15

- Writing the inequality

If she has 60 days to crochet a minimum of 3 blankets but she can complete it in 15 days, she can skip crocheting 45 days because:

AvailableDays=60-RequiredDaysAvailableDays=60−RequiredDays

AvailableDays=60-15=45DaysAvailableDays=60−15=45Days

So, the inequality will be:

s\leq 45s≤45

The inequality means that she can skip crocheting a maximum of 45 days since she needs 15 days to crochet a minimum of 3 blankets.

Have a nice day!

3 0
3 years ago
The midpoint of AC is
AnnZ [28]

The midpoint of AC is E.

Hope this helps.

r3t40

5 0
3 years ago
Read 2 more answers
A ramp rises 2.9 ft vertically and extends 58 At horizontally. Find the slope of the ramp.​
Ymorist [56]

Answer:

0.05

Step-by-step explanation:

The formula for slope is rise/run.

So, in this case it would be 2.9ft/58ft = 0.05

8 0
3 years ago
Read 2 more answers
Other questions:
  • Order of operation 24 - 8 ÷ 4
    10·2 answers
  • Unit 1 Lesson 4 Cumulative Practice Problems
    11·1 answer
  • Is the given value a solution of the equation? write yes or no.
    6·1 answer
  • Write a decimal equation that has a product of 3.15
    9·1 answer
  • 136+12x=-4(1-2x) simplify
    6·1 answer
  • Write each phrase as an algebraic expression<br><br> Two times n squared added to nine
    5·2 answers
  • Nhich proportion could be used to determine if the figures represent a dilation?
    5·1 answer
  • Is this right??? Yes or no
    10·1 answer
  • Ok someone make a question that can be represented by 9 divided by 1/3
    11·1 answer
  • Find the length of side A
    8·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!