We have $8.50 an hour gross minus $2.15 an hour tax and bennys. Then $3.75 daily expense. In one week our net take-away y after x hours is
y = x(8.50 - 2.15) - 5(3.75)
That's the answer, or we can simplify it to
Answer: y = 6.35 x - 18.75
Answer: The slope, 6.35, is the net dollars per hour <em>before weekly expenses.</em>
Answer: The y intercept, -18.75, is the weekly expense, negative because it's an expense.
To make $120 in a week, we solve for x where y=120
120 = 6.35x - 18.75
138.75 = 6.35 x
x = 138.75 / 6.35 = 21.8503937007874
That wasn't the nice round number I was expecting/hoping for. I don't see a mistake so let's go with
Answer: 21.85 hours to make $120
Answer:
102.8
Step-by-step explanation:
If log₁₀y = 2.012, y = 10^2.012 = 102.8
Answer:
Dh/dt = 0.082 ft/min
Step-by-step explanation:
As a perpendicular cross section of the trough is in the shape of an isosceles triangle the trough has a circular cone shape wit base of 1 feet and height h = 2 feet.
The volume of a circular cone is:
V(c) = 1/3 * π*r²*h
Then differentiating on both sides of the equation we get:
DV(c)/dt = 1/3* π*r² * Dh/dt (1)
We know that DV(c) / dt is 1 ft³ / 5 min or 1/5 ft³/min
and we are were asked how fast is the water rising when the water is 1/2 foot deep. We need to know what is the value of r at that moment
By proportion we know
r/h ( at the top of the cone 0,5/ 2) is equal to r/0.5 when water is 1/2 foot deep
Then r/h = 0,5/2 = r/0.5
r = (0,5)*( 0.5) / 2 ⇒ r = 0,125 ft
Then in equation (1) we got
(1/5) / 1/3* π*r² = Dh/dt
Dh/dt = 1/ 5*0.01635
Dh/dt = 0.082 ft/min
The variance of a distribution is the square of the standard deviation
The variance of the data is 2.2
<h3>How to calculate the variance</h3>
Start by calculating the expected value using:

So, we have:

This gives

Next, calculate E(x^2) using:

So, we have:


The variance is then calculated as:

So, we have:


Approximate

Hence, the variance of the data is 2.2
Read more about variance at:
brainly.com/question/15858152