Answer:
12.5 hours
Step-by-step explanation:
15/6 is 2.5. 2.5 is how many hours per worker. 5 times 2.5 is 12.5 hours
Answer:
Plot the points (0,0) and (1,3) to make the line.
Step-by-step explanation:
We know that a linear equation is y=mx+b, m is the slope and b is the y-intercept. We can see that the slope is m=3, and there is no b meaning b=0. Since the y-intercept is 0 we can start from the origin (0,0). The slope is 3/1 or known as rise/run. You go up 3 and go right 1, making the second point (1,3). This should work.
Answer:
336x + 624
Step-by-step explanation: