<span>2.8 x 10^6 N
We have 9.8 x 10^7 J or 9.8 x 10^7 kg*m^2/s^2 of work done through a distance of 35 meters. Since work is defined as force over distance, that means that:
F * 35m = 9.8 x 10^7 kg*m^2/s^2
Solving for F, gives
F * 35m = 9.8 x 10^7 kg*m^2/s^2
F = 9.8 x 10^7 kg*m^2/s^2 / 35m
F = 2.8 x 10^6 kg*m/s^2
F = 2.8 x 10^6 N
So the force exerted by the tugboat is 2.8x10^6 Newtons.</span>
Answer:
The slope is -3/4 because it rises goes down 3 and runs 4. the Y-intercept or where the line meets the y line is 3
Step-by-step explanation:
Answer:
3.1415926535 8979323846
Step-by-step explanation:
Answer:
1.08
Step-by-step explanation:
Answer:
irrational
Step-by-step explanation:
An irrational number has an endless number of digits to the right of the decimal