1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
wlad13 [49]
3 years ago
6

(10,000 . x⁻⁴ . y³)³/⁴Plz answer nowI will mark brainliest

Mathematics
1 answer:
cestrela7 [59]3 years ago
7 0
..................................

You might be interested in
What is the next number in the following pattern?<br> 4,- 6, 8,- 10, 12, ...
Scorpion4ik [409]

Answer:

-14

Step-by-step explanation:

im not really sure

7 0
2 years ago
Read 2 more answers
A shipment of 50,000 transistors arrives at a manufacturing plant. The quality control engineer at the plant obtains a random sa
Aleks04 [339]

Step-by-step explanation:

remember, the number of possible combinations to pick m out of n elements is C(n, m) = n!/(m! × (n-m)!)

50,000 transistors.

4% are defective, that means 4/100 = 1/25 of the whole.

so, the probability for one picked transistor to be defective is 1/25.

and the probability for it to work properly is then 1-1/25 = 24/25.

now, 500 picks are done.

to accept the shipment, 9 or less of these 500 picks must be defective.

the probability is then the sum of the probabilities to get

0 defective = (24/25)⁵⁰⁰

1 defective = (24/25)⁴⁹⁹×1/25 × C(500, 1)

= 24⁴⁹⁹/25⁵⁰⁰ × 500

2 defective = (24/25)⁴⁹⁸×1/25² × C(500, 2)

= 24⁴⁹⁸/25⁵⁰⁰ × 250×499

3 defective = 24⁴⁹⁷/25⁵⁰⁰ × C(500, 3) =

= 24⁴⁹⁷/25⁵⁰⁰ × 250×499×166

...

9 defective = 24⁴⁹¹/25⁵⁰⁰ × C(500, 9) =

= 24⁴⁹¹/25⁵⁰⁰ × 500×499×498×497×496×495×494×493×492×491 /

9×8×7×6×5×4×3×2 =

= 24⁴⁹¹/25⁵⁰⁰ × 50×499×166×71×31×55×494×493×41×491

best to use Excel or another form of spreadsheet to calculate all this and add it all up :

the probability that the engineer will accept the shipment is

0.004376634...

which makes sense, when you think about it, because 10 defect units in the 500 is only 2%. and since the whole shipment contains 4% defect units, it is highly unlikely that the random sample of 500 will pick so overwhelmingly the good pieces.

is the acceptance policy good ?

that completely depends on the circumstances.

what was the requirement about max. faulty rate in the first place ? if it was 2%, then the engineer's approach is basically sound.

it then further depends what are the costs resulting from a faulty unit ? that depends again on when the defect is usually found (still in manufacturing, or already out there at the customer site, or somewhere in between) and how critical the product containing such transistors is. e.g. recalls for products are extremely costly, while simply sorting the bad transistors out during the manufacturing process can be rather cheap. if there is a reliable and quick process to do so.

so, depending on repair, outage and even penalty costs it might be even advisable to have a harder limit during the sample test.

in other words - it depends on experience and the found distribution/probability curve, standard deviation, costs involved and other factors to define the best criteria for the sample test.

3 0
2 years ago
Next Question!
rodikova [14]

Answer:

1/6≈0.17≈17%

Step-by-step explanation:

6 0
3 years ago
Read 2 more answers
Can someone help with the questions in the picture with #22 and both parts of part 23
poizon [28]
#22 is Ian. #23.a. is 77%. b. is Yes. c. is 16.
5 0
3 years ago
Read 2 more answers
Use 3.14 for the value of , and round your answers to two decimal places, where applicable. If the diameter of a circle is 15 m,
sergejj [24]

if the diameter of a circle is 15, its radius is half that or 7.5.

\bf \textit{area of a circle}\\\\ A=\pi r^2~~ \begin{cases} r=radius\\[-0.5em] \hrulefill\\ r=7.5 \end{cases} A=\pi (7.5)^2\implies A=56.25\pi \implies \stackrel{\pi =3.14}{A=176.625}

7 0
3 years ago
Other questions:
  • What is the slope for the equation y=7
    6·2 answers
  • V=1/3πr²<br><br> Solving for r²
    12·1 answer
  • The daily cost of production in a factory is calculated using c(x) = 200 +16 x, where x is the number of complete products manuf
    15·1 answer
  • Ten more than half a number is fifteen. Write that in number form pls
    10·2 answers
  • Identify the slope and y-intercept for the linear equation y = 4x - 2.
    6·1 answer
  • What is 4.50 15% of?
    8·2 answers
  • the vertices of triangle DEF are D(-7,10) E (-5,5) and F (-8,1) if triangle DEF is translated to the right 12 units what are the
    12·1 answer
  • Use the Distributive Property to determine which of the following statements is equivalent to 5(2a – 3b).
    9·1 answer
  • Simplify the expression 5x + 4 + 9x =
    7·2 answers
  • Help if u know please
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!