-8r^5+23r^3-11r+17
Wasn’t Sure What It Was Asking So Hopefully That Works For You
1st thing you need to do is to graph the line y = x - 3 as a dashed line, since the it is just a less than symbol. Once the line is graphed, we need to decide which side to shade. I tend to use (0, 0) if at all possible. We check 0 < 0 - 3
Since 0 is not less than -3 then we shade away from the point (0, 0). That is how you find the answer.
Answer: a) 0.9544996
b) 0.9999366
Step-by-step explanation:
Given : The actual measured resistances of wires produced by company A have a normal probability distribution with mean
ohm and standard deviation
ohm.
Wires manufactured for use in a computer system are specified to have resistances between .12 and .14 ohms.
Let x be the random variable that represents the value of resistance in wires.
Using formula for z-score , 
The z-value at x= 0.12 will be

The z-value at x= 0.14 will be

The p-value : 

Hence, the probability that a randomly selected wire from company A’s production will meet the specifications = 0.9544996
b) Sample size : n= 4
Using formula for z-score , 
The z-value at x= 0.12 will be

The z-value at x= 0.14 will be

The p-value : 

The probability that all four in a randomly selected system will meet the specifications = 0.9999366
Answer:
y=17,x=15
Step-by-step explanation:
180-112=68
68/4=y=17
180-68=112
112-7=105
105/7=x=15
Answer:
1st) geometric
2nd) arithmetic
3rd) arithmetic
Step-by-step explanation:
Geometric = you multiply or divide to get the next term
Arithmetic = you add or subtract to get the next term
1st) you times by 3 to get next term = geometric
2nd) you add one to get next terms = arithmetic
3rd) you add 4 to get next term = arithmetic