1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
lys-0071 [83]
3 years ago
6

Which processor that manipulate graphic data to form images on a monitor screen?

Computers and Technology
2 answers:
vladimir1956 [14]3 years ago
6 0
A graphics processing unit. (GPU)
Dmitrij [34]3 years ago
3 0
Konichiwa
A graphics processing unit is the correct answer
Have a nice day :3
You might be interested in
Some people use the term _____ to refer to the case that contains and protects the motherboard, internal hard drive, memory, and
Volgvan

Answer:

System unit.

Explanation:

Some people use the term system unit to refer to the case that contains and protects the motherboard, internal hard drive, memory, and other electronic components of the computer from damage.

A system unit also referred to as chassis or tower can be defined as a hardware case that is typically used as a protective case for the main component or primary devices such as power supply, random access memory (RAM), graphics card, CD-ROM drive, Harddisk drive, motherboard, internal cables, central processing unit (CPU) that makes up a computer system.

Basically, the main purpose of a system unit is to properly house the main components of a computer, serve as an electrical insulator and to prevent them from any form of damage.

7 0
2 years ago
How long does it take 2 consultants to create a slide deck of 120 slides, assuming one consultant make 2 slides per hour?
Andreyy89

It would take 2 consultants 30 hours to create a slide deck of 120 slides.

Explanation:

Rate of slide making by one consultant- 2 slides per hour

Target- 120 slides

2 consultants are employed in the job-  

Since 2 consultants are employed in the job, total rate of making slides per hour would be 4 slides/hour (2*2 slides/hour)

Time required to complete 120 slides= total slides/rate of doing slides per hour

Substituting the values, we get

Time required= 120/4= 30 hours

Hence, it would take 30 hours for 2 consultants to create a slide deck of 120 slides.

7 0
3 years ago
The pc card and cardbus devices are being replaced by what technology?
Ronch [10]
They are replaced by ExpressCard

3 0
2 years ago
The limitations placed on employees in accordance with the company's policies and procedures
Anna71 [15]

Answer:

Answer is B!

Explanation:

I just took the quiz (:

5 0
3 years ago
A major ozone depletion happened in the 1900s. What was it caused by
melomori [17]
It was caused by air pollution and the extreme heat built up underneath it. <span />
3 0
3 years ago
Read 2 more answers
Other questions:
  • Designing the moving parts of a car—including the engine, drivetrain, steering, and brakes—is done by what type of engineer?
    11·2 answers
  • In addition to not parking where signs prohibit it, you should never park __________________.
    12·1 answer
  • In an advanced word processing program which type of image or graphic is available in a variety of formats and styles?
    12·2 answers
  • Which statement describes what happens if multiple users make changes simultaneously to a presentation when
    10·1 answer
  • Security and protection as it relates to operating systems is grouped into four categories: Availability, Data integrity, Authen
    9·1 answer
  • Who would use a CLI? (Command Line Interface)
    9·1 answer
  • Reading (BCK FORM 2C IT 2020-2021)
    12·2 answers
  • What would be printed to the screen when the following program is run?
    11·1 answer
  • What is a system of access control that allows only limited use of material that has been legally purchased?
    7·1 answer
  • How do i answer a qestion on brainly
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!