I'm going to assume the crust covered by the dosenot matter because the total surface area cannot be found without the depth of the pie.
So the surface are is the area of the top of the pie, the top of the pie is circular and is equal to 2

r²
The diameter is the sum of 2 radii, hence r=8
D=12
= 2r =12
r=8
With the raduis the area can be found
A= 2

r²
A=2

8²
A=2(64)

A=128

If the pie cost 10.99, the cost per inch can be found by dividing the area by cost
cost/inch =128

/10.99
cost/inch =11.64

= 11.64(3.14)
= 36.57
The pie costs 36 cents per square inch
Total cost=$142
cost of parts=$62
cost paid for labour=$142-$62=$80
According to question,
》cost of labour per hr=$32
which can be written as,
》cost of labour/time=$32
Use cross multiplication,
》time=cost of labour/32
Since cost of labour is 80,
Time=80/32
=2.5hrs
Answer:
B
Step-by-step explanation:
The answer has to be 1,350 is that one of your options
Answer:
It was gained 4 1/4 points.
Step-by-step explanation:
- 7 1/8 - 1 5/8 + 13 = - 8 6/8 + 13 = - 8 3/4 + 13 = - 8 - 3/4 + 12 + 4/4 = 4 1/4