Answer: 2.2 meters
Step-by-step explanation:
The data is:
The initial piece is 6.35 meters long.
We cut 25 pieces of 16.2cm each, so in pieces only we have:
25*16.2cm = 405cm
1m = 100cm
Then: 405cm = (405/100) m = 4.05m
And each time that we cut a piece, we have 4mm of waste.
Then we have 25 times the 4mm of waste, this means that the total waste is:
4mm*25 = 100mm
and 1000mm = 1m
100mm = (100/1000) m = 0.1m
So the total amount that was cut is:
4.05m + 0.1m = 4.15m
The length in the channel iron will be: 6.35m - 4.15m = 2.2 meters
Answer:
$37.50
Step-by-step explanation:
50*.25=12.50
Take $50 - 12.50 = 37.50
You divide 1 by 4.76 and you get 0.21 as your main answer
Mischa wrote the quadratic equation 0 = –x2 + 4x – 7 in standard form
The standard form of quadratic equation is

When y=0 then the standard equation becomes

Now we compare the given equation
with
and find the value of a, b,c
-x^2 can be written as -1x^2
a= -1 , b=4 and c=-7
The value of c is -7