I believe you meant "why is the number of shifts multiplied by approximately 4.5 to obtain the total number of operators required to run the plant"
Answer and Explanation:
There are 3 shifts per day, 49 weeks per year and 5 shifts per operator per week
To get total number of operators required to run the plant, we multiply number of shifts in a year by number if operators per shift.
49 weeks×5 shifts= 245 shifts per operator per year
365×3 shifts= 1095 shifts per year
1095/245=4.5 operators per shift
total number of operators required to run the plant(per day) = 4.5×3= 13.5 approximately 14
total number of operators required to run the plant(per year) =4.5×1095=4927.5 approximately 4928
X is equal to 440
440/8=55
Answer:
WX = 9
Step-by-step explanation:
WY is the entire line - this tells you that the length of the entire line is 11.
XY is a section of the line, and WX is the section you need to find the length for. Since it is given that XY is of length 2, we can find the length of WX by subtracting the length of XY from WY.
11 (WY) - 2 (XY) = 9.