45x+30= price for electrician when x= hours
For every 1/4 metric ton it takes 1/8 hours
then multipling by 8 to make the hours =1
for every 2 metric tons it take 1 hour
so the quotient is 2 metric tons per 1 hour
42 - -84=-42
Hope this helps :)
The coordinates of the image point are given to be B(4, -8). We are to find the coordinates of pre-image that is the coordinates before the translation.
The translation made was (x-2, y+3)
This means, the x coordinate was moved 2 units to left and y coordinate was moved 3 units above.
So, the coordinates of original point will be, 2 units to right of B and 3 units down of B.
So the coordinates will be (6, -11)
More than one triangle <span>exists with the given angle measures. So, this triangle is not equiangular, but has only 2 angles of equal measure.
Hope
this
helped</span>