Answer:
it take 29.23 years, my salary to double.
Explanation:
To make the salary double I have to increase the value of salary by 100%. If inflation rate is 2.4 percent per year and salary increase the same rate the time period to make it double can be calculated as follow.
As every year 2.4% has compounding effect, so we will use compounding formula to solve this problem.
Target value = Existing value ( 1 + growth rate )^time period
200% = 100% ( 1 + 2.4% )^n
2 = 1 ( 1 + 0.024 )^n
2 = 1 ( 1.024 )^n
2 = 1.024^n
Taking log on both sides to solve the n
Log 2 = n Log 1.024
n = Log 2 / Log 1.024
n = 29.23 years
I will take 29.23 year to double the salary
Answer:
The correct answer is letter "B": cost-benefit assessment.
Explanation:
Cost-benefit assessment implies analyzing what the costs and benefits of engaging in business are. The approach aims to minimize losses and maximize benefits. It does not necessarily imply there are not going to be losses during the business cycle but could reduce them as much as possible.
Answer:
the labor demand curve is downsloping is the correct option is
Labor unions are restrained in their wage demands because the labor demand curve is downsloping
Answer:
d. 8.2%
Explanation:
The computation of the WACC is shown below:
= Weightage of debt × cost of debt × ( 1- tax rate) + (Weightage of common stock) × (cost of common stock)
where,
Weighted of debt = Debt ÷ total firm
= (0.60 ÷ 1.60)
= 0.375
And, the weighted of common stock = (Common stock ÷ total firm)
= 1 ÷ 1.60
= 0.625
The total firm is
= 0.60 + 1
= 1.60
Now put these values to the above formula
So, the value would equal to
= (0.375 × 8%) × ( 1 - 35%) + (0.625 × 10%)
= 1.95% + 6.25%
= 8.20%
Answer:
Total overhead rate = $34.17 per machine hour
Explanation:
The total overhead rate would the sum of the variable overhead rate and the fixed overhead rate
<em>The pre-determined fixed overhead absorption rate = Estimated fixed overhead /Estimated machine hours </em>
<em>DATA:</em>
<em>Estimated overhead - $256,500.</em>
<em>Estimated machine hours - 10,000 machine hours</em>
The pre-determined fixed overhead absorption rate =
$256,500/ 10,000 machine hours = 25.65 per hour
<em>The pre-determined overhead absorption rate = $25.65 per hour</em>
Total overhead rate = Variable rate + Fixed rate
= $8.52 + $25.65 = $34.17
Total overhead rate = $34.17 per machine hour