Answer:
24 and 20
Step-by-step explanation:
opposite sides are equal
.1 Simplify: 5n(2n3+n2+8)+n(4-n).
Solution:
5n(2n3+n2+8)+n(4-n).
= 5n × 2n3 + 5n × n2 + 5n × 8 + n × 4 - n × n.
= 10n4 + 5n3 + 40n + 4n – n2.
= 10n4 + 5n3 + 44n – n2.
= 10n4 + 5n3 – n2 + 44n.
Answer: 10n4 + 5n3 – n2 + 44n
Answer:
$12.85
Step-by-step explanation:
First we need to find the sale price of the CD
Sale price = old price - old price * discount rate
= 17 - 17* .3
= 17 - 5.1
= 11.9
The sale price of the CD is 11.90
Now we need to find the tax
tax = sale price of cd * tax rate
= 11.9 * .08
= .95
The final cost of the CD is sale price of CD plus the tax
Total cost = sale price of CD + tax
= 11.90 + .95
=12.85
Answer:
a) W₁ = 78400 [J]
b)Wt = 82320 [J]
Step-by-step explanation:
a) W = ∫ f*dl general expression for work
If we have a chain with density of 10 Kg/m, distributed weight would be
9.8 m/s² * 10 kg = mg
Total length of th chain is 40 m, and the function of y at any time is
f(y) = (40 - y ) mg where ( 40 - y ) is te length of chain to be winded
At the beggining we have to wind 40 meters y = 0 at the end of the proccess y = 40 and there is nothing to wind then:
f(y) = mg* (40 - y )
W₁ = ∫f(y) * dy ⇒ W₁ = ∫₀⁴⁰ mg* (40 - y ) dy ⇒ W₁ = mg [ ∫₀⁴⁰ 40dy - ∫₀⁴⁰ ydy
W₁ = mg [ 40*y |₀⁴⁰ - 1/2 * y² |₀⁴⁰ ⇒ W₁ = mg* [ 40*40 - 1/2 (40)² ]
W₁ = mg * [1/2] W₁ = 10*9,8* ( 800 )
W₁ = 78400 [J]
b) Now we can calculate work to do if we have a 25 block and the chain is weightless
W₂ = ∫ mg* dy ⇒ W₂ = ∫₀⁴⁰ mg*dy ⇒ W₂ = mg y |₀⁴⁰
W₂ = mg* 40 = 10*9.8* 40
W₂ = 3920 [J]
Total work
Wt = W₁ + W₂ ⇒ Wt = 78400 + 3920
Wt = 82320 [J]