Answer:

Step-by-step explanation:
For this case we want to find the following limit:

And we can find the limit distirbuting into each term like this:

And replacing we got:

So then the final answer for this case is:

Answer:
for 2. I don't think it can be a triangle
Answer:
A ----¢ are
B ----¢ are
C ----¢ are
D ----¢ are
E ----¢ aren't
F ----¢ are
And we're done.
Thanks for watching buddy good luck.
♥️♥️♥️♥️♥️
Answer:
2.719 minutes
Step-by-step explanation:
Step 1 :
We have to consider using the M/G/I /GD /∞/∞ Queuing system with the rate of arrival λ and the rate of service μ.
Since average of 40 cars arrive every hour at the painting facility, it follows that:
Arrival rate λ = 40cars /hour
= 40/60 cars/hour
=2/3 cars/hour
More, we were told that 95% of the cars require 1 minute to paint, 5% must be painted twice and require 2.5 minutes to paint, therefore, the average time to paint a car is given by
95/100x1 + 5/100 x 2.5 = 19/20 + 1/8 = 43/40min
It follows that:
Service rates μ = 40/43cars/min
Let the first integer be
. So, the next even number is 
Let's translate the formula: the square of the second is
, twice the first is
. So, the equation is

Expand the square to get

The solutions to this equations are

So, the possible consecutive even numbers are
