Answer:
c. x21 + x22 + x23 less or equal than 2800 y2
Step-by-step explanation:
The plant has a maximum capacity of 2800 then the sum of all these operations must be equal to or less than 2800. The site of the plant has capacity constraint which needs to be determine through equation. The total capacity for the plant 2 is only 2800 the operation has to be distributed with keeping in mind the capacity limit.
To find the slope between the points, you would go through this process
(-1-6)/(4-0)
And we get
(-7)/4
Aka
-(7/4) which is our slope
Greetings!
When reflecting a shape over the x-axis, you simply change the number to its opposite positive/negative equivalent.
This means that the new co-ordinates would be (-5,1) , (-5,4) and (-2,4).
Hope this helps!
Answer:

Step-by-step explanation:
Given parameters:
Number of white balls = 24
Number of black balls = 16
Unknown:
The probability that white ball is drawn at random = ?
Solution:
The probability of an event is the likelihood of such an event to occur. That an event will occur has a probability of 1, it will not occur have a probability of zero.
In this problem, the total number of outcomes of drawing any ball has sample space of (24 + 16)outcomes = 40outcomes.
Probability of an event = 
Pr(white balls) =
= 
The expressions is undefined in the set of the real numbers.