Answer:
1/2 or 0.5
Step-by-step explanation:
The answer would be
4d+2.75p=12
Answer:
Step-by-step explanation:
You have to start out with the distributive property 5 times 2 times c is 10+5c; now you have to subtract 5c on both sides in the upside down T chart, now its 10=45+c and your answer will be c=4.5.
Answer:
95.64% probability that pledges are received within 40 days
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What is the probability that pledges are received within 40 days
This is the pvalue of Z when X = 40. So



has a pvalue of 0.9564
95.64% probability that pledges are received within 40 days
Answer:
B. 600 ft
Step-by-step explanation:
The formula for the Perimeter of a right triangle = Side a + Side b + Side c
The perimeter of a right triangle is 60 feet
If the lengths of the sides of the triangle are each multiplied by 10, what is the perimeter of the new right triangle?
Hence, the perimeter of the new right triangle = 10 × 60ft
= 600ft
Option B is the correct Option.