Answer:
I'm not completely what the correct answer is
Answer:
1)autocratic leader
2)democratic leader
Explanation:
1- this leader is one who works fast without consulting employees.
2- this leader consults employees and make sure everyone takes par in decision making
sorry only know 2...
Answer: See explanation
Explanation:
a. The optimal order quantity can be calculated as:
= √2DS/H
where
D = 3 × 12 × 3487 × 0. 75
= 94149
Total cost incurred during purchase
= $1.55 + $0.70
= $2.25
Setup cost (S) = $186
Holding cost
= 32% × $2.25
= 0.32 × $2.25
= $0.72
Optimal order quantity
= √(2 × 94149 × 186)/0.72
= 6974.50
b. This will be calculated as:
Annual demand / EOQ
= 94149/6974.50
= 13.50
The company should order cotton 13.5 times per year.
c. Since the first order is needed on 1-July and lead time is 2 weeks, SYM should place the order before 17th June.
d. This will be:
= Annual demand / EOQ
= 94149/6974.50
= 13.5 orders
e. The resulting annual holding cost will be:
= 0.72 × (6974.50/2)
= 0.72 × 3487.25
= $2510.82
f. The resulting annual ordering will be:
= 94149/6974.50 × $186
= 13.5 × $186
= $2511
Answer:
C. Significant amounts of indirect costs are allocated using only one or two cost pools.
D. All or most indirect costs are identified as output unit-level costs.
E. Products make diverse demands on resources because of differences in volume, process steps, batch size, or complexity.
F. Products that a company is well suited to make and sell show small profits, whereas products that a company is less suited to produce and sell show large profits.
Explanation:
ABC (activity based costs) method focuses on individual activities as the main cost objects. After it determines the cost of individual activities, it uses them as the basis for assigning costs to products and services. ABC method allocates overhead costs based on the main cost objects.