Answer:
simple interest= 5100
using formula SI=<u> </u><u>PTR</u>
<u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u>100
hope it helps..
Answer:
2 hours
Step-by-step explanation:
Train B's speed: 4/3 × 60 = 80
Combined speed = 80 + 60 = 120
Time = 240/120 = 2
Answer:
y= -8
Step-by-step explanation:

where m is the slope of the line.
m= 0 which is equal to the slope of the line y=9
because both are parallel.


The probability of matching the first one correctly is 1/3 .
Then there are only two baby-pix left, so ...
The probability of matching the second one correctly is 1/2 .
Then there's only one baby-pic left, so ...
The probability of matching the third one correctly is 1 .
So the probability of matching all three correctly is
(1/3) x (1/2) x (1) = 1/6 = (16 and 2/3) percent .