Faster Production.
Easily Accessible.
Better Quality.
Tangible Design and Product Testing.
Cost-effectiveness.
Creative Designs and Customization Freedom.
Award documentation is typically required to be prepared and submitted within how long after the end of a project period of 90 days.
What does Award includes?
- Awards to international organizations and government institutions, whether or whether they are covered by SNAP, must include annual expenditure information.
- The report shall be submitted for each budget period, if necessary on an annual basis, no later than 90 days following the end of the calendar quarter in which the budget period concluded.
- The report must include information on any allowed extensions to the budgetary period. If more regular reporting is necessary, both the frequency and the deadline shall be stated in the NoA.
Learn more about the Post-Award Monitoring and Reporting with the help of the given link:
brainly.com/question/15415195
#SPJ4
Cause they make up half the population of the united states of america
Hey there! This is the difference between a joystick and a mouse:
A mouse is moved back and forth and up and down by a person's hand. The mouse device moves across the table surface. A joystick on the other hand stays stationary and is basically composed of a base and a stick. A vertical stick is held in the hand and tilted forward backward left and right. But the only thing that moves with a joystick is the center stick.
I hope this helps you out! Let me know if you have any questions!