Answer:
Unitary variable cost= $40
Total variable cost= $800,000
Explanation:
Giving the following information:
Direct materials $ 10 per unit
Direct labor $ 20 per unit
Overhead costs for the year Variable overhead $ 10 per unit
Fixed overhead $ 160,000
Units produced 20,000 units
Unitary variable cost= direct material + direct labor + manufacturing overhead= 10 + 20 + 10= $40
Total variable cost= 20000units* 40= $800,000
Answer: 4 containers
Explanation:
The formula used to get the number of containers that are needed will be:
N = DT(1+X)/C
where,
N = total containers
D = planned usage rate used by the work center = 111 parts per hour
T = average waiting time = 100 minutes = 100/60 hours = 1.67 hours
X = inefficiency factor = 0.21
C = capacity of standard container = 5 dozens = 5 × 12 = 60 parts
N = DT(1+X)/C
N = (111 × 1.67)(1 + 0.21)/60
N = (185.37 × 1.21)/60
N = 224.2977/60
N = 3.738
N = 4 approximately
4 containers will be needed
A time deposit or term deposit is a deposit in a financial institution with a specific maturity date or a period to maturity, commonly referred to as its “term”. Time deposits differ from at call deposits, such as savings or checking accounts, which can be withdrawn at any time, without any notice or penalty.
Answer:
The firm's cash flow to creditors during 2016 was -$131,000.
Explanation:
Cash flow to creditors
= Interest expense - (Ending LT Debt - Beginning LT Debt)
= $99,000 - ($1,680,000 - $1,450,000)
= -$131,000
Therefore, The firm's cash flow to creditors during 2016 was -$131,000.
1.
(in gambling) an independent party with whom each of those who make a wager deposits the money or counters wagered.
2.
a person with an interest or concern in something, especially a business.