Sample Response: First, draw and label a number line. Then plot the five values that are given above the line. Draw a box from the lower quartile to the upper quartile, with a line dividing it at the median. Then draw lines from the minimum and maximum values connecting to the box to form the whiskers.
First, create a scale that includes all the numbers- that being, you can plot both the minimum and maximum values on it.
Next, draw a line of a set height (I tend to use 2 squares in my work) where the median is. Next, draw similar lines, at the same height, for the rest of the values- both quartiles and the maximum values. You can obviously do this in whatever order you like, but that's how I do it.
Next, join up the tops and bottoms of the quartiles, with the median in the middle, and connect the middles of the quartiles to their corresponding minimum or maximum values.