1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
svlad2 [7]
3 years ago
11

Andy estimated that he would need 79 feet of lumber for a tree house project. He later found that the actual amount of lumber ne

eded was 68 feet. What was the percent error of Andy's estimation?
Mathematics
1 answer:
Radda [10]3 years ago
5 0

Answer:

Step-by-step explanation:

79 divided by 68 is your answer

You can do the math

You might be interested in
Evaluate g(n-7) if g(x) = <img src="https://tex.z-dn.net/?f=%5Cfrac%7Bx%5E2-5%7D%7B3n%7D" id="TexFormula1" title="\frac{x^2-5}{3
WINSTONCH [101]
Hello. this is the answer for your question

6 0
3 years ago
Pilar is playing with a motorized toy boat. She puts the boat in a lake and it travels 400m at a constant speed. On the way back
ankoles [38]

Answer:

The trip normally takes 8 minutes

Step-by-step explanation:

The given information states that the away distance the boat traveled = 400 m

The time traveled at the same initial  speed , v₁, by the boat on the way back = 2 minutes

The increase in speed of the boat by Pilar =  10 m/min

The new speed, v₂ = v₁ + 10

The time for the return trip, t₂ = 60 seconds (1 minute) faster than time for the trip, t₁

t₂ = t₁ - 1

Therefore we have;

v₁ × t₁ = v₁×2 + v₂×(t₂-2) = 400

v₁×2 + (v₁ + 10)×(t₂-2) = 400

(v₁ + 10)×t₂ - 20 = 400

But v₁ = 400/t₁ = 400/(t₂ + 1)

Which gives;

(400/(t₂ + 1) + 10)×t₂ - 20 = 400

10×(t₂²+ 36·t₂-2)/(t₂+1) = 400

10·t₂²+ 10·t₂-420 = 0

t₂²+ t₂-42 = 0

(t₂ - 7)(t₂ + 6) = 0

t₂ = 7 minutes or -6 minutes

Given that t₂ is a natural number, we have, t₂ = 7 minutes

Whereby, t₂ = t₁ - 1, we have;

7 =  t₁ - 1

t₁ = 1 + 7 = 8 Minutes

The trip normally takes 8 minutes

3 0
3 years ago
Santa and his elves had a workshop that allowed them to produce 22{,}912{,}546{,}99222,912,546,99222, comma, 912, comma, 546, co
zvonat [6]

Answer: 180 times

Step-by-step explanation:

Given the following :

Production capacity of old workshop :22,912,546,992 toys per year

Production capacity of new workshop:

4,134,232,638,937 toys

Approximately how many times as many toys can the new workshop produce each year compared to the old workshop?

Production capacity of new workshop / production capacity of old workshop

= 4,134,232,638,937 / 22,912,546,992

= 180.435

= 180 ( nearest whole number)

3 0
4 years ago
Select all of the choices that are equal to (-5) – (-12).
krek1111 [17]
The answer is 7 i’m pretty sure
4 0
3 years ago
Read 2 more answers
HELPPPP PLEASEEE!!!!!
timurjin [86]

Answer: the answer is the second one.

Hope this helps

Step-by-step explanation:

4 0
3 years ago
Other questions:
  • Please help picture shown !!!!!!
    10·1 answer
  • Shannon evaluated the expression 9-6+12÷(3×2) and got the answer 14. Is she correct?
    12·2 answers
  • Please help me right away and you will get 12 points I need it done today so plz help me
    6·1 answer
  • A student uses four different tape measures to estimate the length of a meter-stick manufactured to be exactly 1 meter. Which me
    6·1 answer
  • If sec 48 = 1.4945, find csc 42
    14·1 answer
  • Plzzzzzzzzzzzzzzzzzzzzzzzzzzzzzz
    15·1 answer
  • 2(y + 5) <br> use the distributive property to expand expressions.
    7·2 answers
  • Help will<br> Give Brainly point 20
    11·1 answer
  • Noah walked a family’s dog 5 times this past month and earned the same amount each time. To thank him, the family gave him an ex
    9·1 answer
  • Please help asap! thank you
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!