Answer:
15150 is the required sum.
Step-by-step explanation:
Gauss method of summing sequences like this is to add the first term to the last term, the second term to the second to the last term and so on until you get to the middle. By doing this, you will always get the same sum. Then you divide the number of terms by two, because you are technically adding the first half of the sequence to the second half. You then multiply the sum of each pair that gave the same number with the number of terms that has been divided by 2. For this problem we have:
3 + 300 = 303
6 + 297 = 303
9 + 294 = 303
and so on.
100÷ 2 = 50.
Therefore we have 50 * 303 = 15150 is the required sum.
Answer: 16, rational
Step-by-step explanation: because its a real number
33.3 square feet
Explanation: 8+8= 16+4= 20 + the top which should not be much more than 8.
Hope this helps:)
Answer:
a) The reorder point necessary to provide a 95 percent service probability is 1557 units.
b) The Z value of 0.74 corresponds to 77% service probability.
Step-by-step explanation:
Average weekly demand (d) = 315 units
The standard deviation of weekly demand (\sigmad) = 90 units
Lead time (L) = 4 weeks
At 95% service level value of Z = 1.65
Reorder point = d x L + safety stock
b) Earlier the safety stock was 297 units(calculated in part a)
Now the safety stock is reduced to 55%.so,55% of 297 = 163.35 units
So the new safety stock = 297 - 163.35 = 133.65
The Z value of 0.74 corresponds to 77% service probability.