1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Alenkinab [10]
3 years ago
8

Lcm and gcm of 38 and 27

Mathematics
1 answer:
Nataliya [291]3 years ago
7 0
LCM → 1026... 

GCF/GCM →  1 

For the LCM just multiply ⇒ 19 × 3 × 3 × 3 × 2 

For the GCM/GCF ⇒ Just look for the multiples that "27" and "38" have in common.. 
You might be interested in
The difference between the value of the sample statistic and the value of the corresponding population parameter is called the _
mel-nik [20]

Answer: c. sampling error

Step-by-step explanation:

  • A population parameter is a number that is evaluated to describe the whole population . For example : Population mean , Population standard deviation etc.
  • A sample statistic gives the estimate value of the population parameter. For example : Sample mean , sample proportion.

Since, the sample is a subset of population , so there are chances for unavoidable variation in sample mean from the population mean that varies from sample to sample .

This variation is known as sampling error.

∴ The difference between the value of the sample statistic and the value of the corresponding population parameter is called the sampling error .

Hence,the correct answer is c. sampling error .

7 0
3 years ago
The cost c, to produce b baseball bats per day is modeled by the function c(b)=0.06b^2 - 7.2b + 390. What number of bats should
Finger [1]
You have two choices.
The minimum possible cost to operate your bat factory for a day is $390,
and there are two quantities of bats that both cost that much.

One possibility: 
                   Produce no bats at all per day.  Zero.  Nada.  None.
                   Cost = 0.06(0)²  -  7.2(0)  +  390  =  $390 per day.

The other choice:
                   Produce  120 bats per day.
                   Cost = 0.06(120²)  -  7.2(120)  +  390
                          = 0.06(14,400)  -  7.2(120)  +  390
                          =      864          -      864      +  390
                          =      $390  per day.

If you produce any other number of bats in a day ... more than zero
but not 120 ... then it will cost you more than $390 to operate the factory
that day.
8 0
3 years ago
A recipe that yields 2 loaves of bread
kozerog [31]

Answer:He can make 7.5 loaves i think

Step-by-step explanation:

7 0
3 years ago
14=6n+6-2n solve for n
Anika [276]

Answer:

n=2

Step-by-step explanation:

14=6n+6-2n

Combine like terms

14 = 4n+6

Subtract 6 from each side

14 -6 = 4n+6-6

8 = 4n

Divide by 4

8/4 = 4n/4

2 =n

8 0
3 years ago
Read 2 more answers
Select the factored form of this expression if it cannot be factored select already factored 2x-4
Dima020 [189]

Answer:

c

Step-by-step explanation:

4 0
3 years ago
Other questions:
  • Find the area (7cm, 20cm, 11 cm, 14 cm
    14·2 answers
  • PLS HELP I WILL MARK!
    10·1 answer
  • HELP!<br>Which graph shows a dilation?​
    7·2 answers
  • Please help and explain
    8·1 answer
  • D. 25 <br> Math question please help
    13·1 answer
  • Trig problem i need help with
    12·1 answer
  • What are some easy ways to find the value of<br> (2017^4−2016^4)/(2017^2+2016^2) without calculator
    5·1 answer
  • What is the greatest common factor of the number pair 18 and 24
    6·1 answer
  • Appeal to reason is a fallacy true or false????
    9·1 answer
  • GIVING OUT 50 POINTS
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!