Answer:
The correct answer is the second option
Answer:
25% is called a quarter of 900
Step-by-step explanation:

Answer:
A. $3,984
Step-by-step explanation:
The amount of interest is computed from ...
I = Prt
For the given values, the interest is ...
I = $3600×0.08×(16/12) = $384
Then the total amount that needs to be repaid is ...
Principal + Interest = $3600 +384 = $3,984
_____
The time period is 16 months, so is 16/12 years.
The time periods of the interest rate and "t" in the formula must match. If the interest rate is an annual rate, then "t" is in years. If the interest rate is a monthly rate, then "t" is the number of months.
For this case, the first thing we must do is define variables.
We have then:
x: number of cubic yards of mulch that first truck can transport
y: number of cubic yards of mulch that second truck can transport
Now we write the expression.
The first truck makes 12 trips to a job site:

The second makes 14 trips:

The difference between the first truck and the second truck is:
Answer:
An expression that represents the difference in the total number of cubic yards that the first truck delivers compared to the second is:
Answer:
Step-by-step explanation:
Isabell, can you see that the sides are 2x6 each? each half of the triangle will make a total rectangle of 2x6 or 12 square meters
there are 4 of those so 48 sq meters plus the base of 4x4 or 16 sq meters
48+16 = 64 square meters total