Do you just need like a study guide with everything wrote down and organized or do you need it in a different way? I might be able to help :)
Answer:
A. Collateral
Explanation:
A collateral is a valuable item, a property or an asset that is offered by a borrower of a loan to the lender of the loan as a form of loan security, such that the lender can take possession of the asset, monetize the asset and recover the losses. Collateralized loans includes car loans and mortgages.
Lending such as those given in business credit card does not require loan securities
The guess the correct answer is much less.
Assume a systems development project effort calculation determines that the system will require 240 function points. If the developers choose to implement this system in the C programming language, approximately 31,200 lines of code will have to be written. If the developers choose Visual Basic to implement the system, the number of lines of code will be much less.
Answer:
If Mary and Tim specialize in the good in which they have a comparative advantage, ______.
Mary would specialize in making cakes while Tim would specialize in making pies.
Explanation:
a) Data and Calculations:
Mary's opportunity cost of making a cake = 2 pies
She can make additional 5 (10/2) cakes instead of making pies
This will increase her cakes to 25 a day (20 + 5)
Tim's opportunity cost of making a cake = 4 pies
She can make additional 40 pies (10 * 4) instead of making cakes
This will increase her pies to 60 pies a day (20 + 40)
When they specialize there will be 25 cakes and 60 pies produced in a day instead of 30 cakes and 30 pies.
Answer:
The $12,000 is the material handling cost should be assigned to products made in March.
Thus, the correct option is a. $12,000
Explanation:
For computing how much of the material handling cost should be assigned, first we have to calculate the per pound of material. The formula is shown below:
Per pound of material = Labor cost ÷ Number of pounds
= $160,000 ÷ 800,000
= $0.2 per pound of material
Now, multiply this per pound of material with moving pounds.
In mathematically,
Material Handling cost = Per unit of pound × Moving material
= $0.2 × 60,000
=$12,000
Hence, the $12,000 is the material handling cost should be assigned to products made in March.
Thus, the correct option is a. $12,000