Answer:
Number of families that should be surveyed if one wants to be 90% sure of being able to estimate the true mean PSLT within 0.5 is at least 43.
Step-by-step explanation:
We are given that one wants to estimate the mean PSLT for the population of all families in New York City with gross incomes in the range $35.000 to $40.000.
If sigma equals 2.0, we have to find that how many families should be surveyed if one wants to be 90% sure of being able to estimate the true mean PSLT within 0.5.
Here, we will use the concept of Margin of error as the statement "true mean PSLT within 0.5" represents the margin of error we want.
<u></u>
<u>SO, Margin of error formula is given by;</u>
Margin of error =
where,
= significance level = 10%
= standard deviation = 2.0
n = number of families
Now, in the z table the critical value of x at 5% (
) level of significance is 1.645.
SO, Margin of error =
0.5 =

n =
= 43.3 ≈ 43
Therefore, number of families that should be surveyed if one wants to be 90% sure of being able to estimate the true mean PSLT within 0.5 is at least 43.
Answer: We know Gabrielle is 9 yrs younger than Mikhail hence it will be x-9 yrs. Sum of their ages is 87. Mikhail's age is 48 yrs.
HOPE THIS HELPS
Answer:
The total cost of the ski hat and the ski boots is $112.35.
Step-by-step explanation:
First, we need to add the prices of the ski hat and the ski boots.
85.50 + 19.50 = $105
Now, we need to find 7% of $105, and then add it to the total.
105 x 0.07 = $7.35
105 + 7.35 = $112.35
Therefore, the total cost of the ski hat and the ski boots is $112.35.
Let me know if this helps!
Answer:
The solution (25, 20) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.
Step-by-step explanation: