V = π r² h
V= π (4x+2)² (5x+4)
V = π (4x+2)(4x+2)(5x+4)
V = π (16x²+16x+4)(5x+4)
V= π(80x³+144x²+84x+16)
V= 251.33x³ +452.39x²+263.89x+50.27
Answer:
Step-by-step explanation:
take two points on the line ,i take (-4,0) and (0,-2)
slope=(y2-y1)/(x2-x1)=(-2-0)/(0+4)=-2/4=-1/2
R - 4.5 < 11
—
r would be 15.5
[ r = 15.5 ]
a = prt
a = 24,000 x 0.06 x(48 / 12)(you have to turn months into years)
a = 24,000 x 0.06 x 4
a = $5,760
The payment due is $5,760
Answer:
3/4 becomes 9/12
5-9 is -4 》-4/12 = -1/3 a.k.a C