The average wait time is simply the averages of all the wait times in a product category. For instance, a custom watch manufacturer might have a wait time that ranges from 5 days to 10 days for a model A watch depending on the options. The average wait time for the model A watch is 7.5 days.
Answer:
Step-by-step explanation:
<h3>Given expression</h3>
<h3>Simplify the expression in steps as below</h3>
Used properties in solution process:
Answer:
A. Increase by 2
Step-by-step explanation:
Given that a fitted multiple regression equation is

This is a multiple regression line with dependent variable y and independent variables x1, x2, x3 and x4
The coefficients of independent variables represent the slope.
In other words the coefficients represent the rate of change of y when xi is changed by 1 unit.
Given that x3 and x4 remain unchanged and x1 increases by 2 and x2 by 2 units
Since slope of x1 is 5, we find for one unit change in x1 we can have 5 units change in y
i.e. for 2 units change in x1, we expect 10 units change in Y
Similarly for 2 units change in x2, we expect -2(4) units change in Y
Put together we have
change in y
Since positive 2, there is an increase by 2
A. Increase by 2
Answer:
14.36446281 is the answer, you probably have to round
Answer:
- angle at A: 51°
- base angles: 64.5°
Step-by-step explanation:
The measure of the inscribed angle BAC is half the measure of the intercepted arc BC, so is 102°/2 = 51°.
The base angles at B and C are the complement of half this value, or ...
90° -(51°/2) = 64.5°
The angle measures in the triangle are ...
∠A = 51°
∠B = ∠C = 64.5°