Based on the given value of pitch (slope), the bottom number simply means the horizontal distance an object runs through.
<h3>What is a pitch?</h3>
A pitch is also referred to as slope and it can be defined as the ratio of the vertical distance (rise) measured to the horizontal distance (running) measured.
<h3>How to determine the pitch (slope) of a roof?</h3>
Mathematically, the pitch (slope) of a roof can be calculated by using this formula:
Pitch (slope) = V/H
<u>Where:</u>
- V is the rising vertical distance of an object.
- H is the horizontal distance an object runs through.
<u>Given the following data:</u>
Vertical distance (rise) = 2 units.
Horizontal distance (running) = 7 units.
By critically observing the given value of pitch (slope) as 2/7, we can infer and logically deduce that the bottom number simply means the horizontal distance an object runs through.
Read more on pitch here: brainly.com/question/3514403
#SPJ1
From the figure, segment QP is in the ray RP and RP contains N and Q in between
so from the options, the two rays will be : ray QP and ray NP
For SU :
segment SU is in the ray RU and RU contains S and T in between,
so from the options again, the two rays will be : ray RU and ray SU
Answer:
huhhh i dont understand fully
Step-by-step explanation: