14

A Quality Analyst wants to construct a sample mean chart for controlling a packaging process. He knows from past experience that

whenever this process is under control, package weight is normally distributed with a mean of twenty ounces and a standard deviation of two ounces. Each day last week, he randomly selected four packages and weighed each:Day WEIGHT (ounces)Monday 23 22 23 24Tuesday 23 21 19 21Wednesday 20 19 20 21Thursday 18 19 20 19Friday 18 20 22 20If he uses upper and lower control limits of 22 and 18 ounces, on what day(s), if any, does this process appear to be out of control?Question 1 options:MondayTuesdayMonday and TuesdayMonday, Tuesday, and ThursdaynoneSaveQuestion 2 (1.67 points)A Quality Analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results:Machine MeasurementsNumber1 17 15 15 17Number2 16 25 18 25Number3 23 24 23 22For upper and lower control limits of 23.29 and 16.71, which machine(s), if any, appear(s) to have an out-of-control process mean?Question 2 options:machine Number1machine Number2machine Number3all of the machinesnone of the machinesSaveQuestion 3 (1.66 points)A Quality Analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results:Machine MeasurementsNumber1 17 15 15 17Number2 16 25 18 25Number3 23 24 23 22What is the estimate of the process mean for whenever it is under control?Question 3 options:1619202123SaveQuestion 4 (2.5 points)Specifications for a piece of material used in the manufacture of a bed mattress require that the piece be between 52.47 and 55.53 inches. The process that produces the piece yields a mean of 54 and a standard deviation of 0.9 inches. The distribution of output is normal. What percentage of the pieces will meet the length specs?Question 4 options:4.45 %91.08 %97.85 %95.54 %None of the AboveSaveQuestion 5 (2.5 points)Specifications for a piece of material used in the manufacture of a bed mattress require that the piece be between a Lower and Upper value (in inches) centered around the process mean. The process that produces the piece yields a mean of 59 and a standard deviation of 0.8 inches. The distribution of output is normal. Within what values will 85.01 percent of sample means fall, if samples of n = 5 are taken and the process is in control?Question 5 options:58.484 , 59.51558.166 , 59.83357.847 , 60.15257.211 , 60.788None of the Above
Business
1 answer:
AlexFokin [52]3 years ago
6 0

Answer:

There are 5 questions altogether, so the answers and explanations are below.

Explanation:

QUESTION 1

Whenever the packaging process is under control, package weight is normally distributed with mean of 20 ounces and standard deviation of 2 ounces. This makes the true mean lie between 18 and 22 [subtract 2 from 20 and add 2 to 20].

For Monday, the mean is the addition of the values then divided by 4. That is, 92/4 = 23

For Tuesday, same computation follows. We have 84/4 = 21

For Wednesday, 80/4 = 20

For Thursday, 76/4 = 19

For Friday, 80/4 = 20

For the packaging process to be out of control, the mean weight for that day of the week must be outside the interval.

The answer is option (A) Monday because the mean weight for that day exceeds the upper limit of 22 ounces.

QUESTION 2

Accordingly, he sampled 4 units of output from each machine.

We will find the mean of the output units from each machine.

M1 : (17+15+15+17) ÷ 4 = 64/4 = 16

M2 : 84 ÷ 4 = 21

M3 : 92 ÷ 4 = 23

The correct answer is option (A) Machine Number 1 because the process mean for that machine is outside the control limit specified. The value 16 is below the lower limit value of 16.71.

QUESTION 3

It is the same as question 2 BUT we are to find the estimate of the process mean for whenever it is under control.

The interval given [16.71 - 23.29] represents the interval within which the process means for machines which are 'under-control' will fall. Hence the estimate of the process mean for whenever the machines are under control is:

(23.29 + 16.71) ÷ 2 = 40/2 = 20

The correct option is (C) 20

QUESTION 4

Specification requires that the piece of material be between 52.47 and 55.53 inches.

The process that produces the piece of material yields an interval of [53.1 - 54.9].

This is gotten from the subtraction of the standard deviation/error from the process mean of 54 and adding the standard error to the process mean of 54.

The answer is option (E) None of the above. This is because the correct answer is 100%. All pieces produced by the process fall within 53.1 and 54.9 inches and this interval falls rightly within the required specification of [52.47 - 55.53] inches.

QUESTION 5

Here, process mean interval is same as the required interval. Subtracting the standard deviation from the process mean and adding it to the process mean, we get our lower limit and upper limit respectively. The distribution of output is also normal.

Since the process is under/in control, it means that the 5 samples had sample means that are within the required interval.

So, since distribution of output (mean) is Normal, 85.01% of the sample means will fall within the middle values of 85.01% of the interval.

The interval spans 1.6 points or inches. This is the distance or difference between the upper and lower limits.

85.01% of 1.6 is 1.36016

We will divide this interval into two so we can get our new standard deviation and subtract it from 59, as well as add it to 59, to get the new interval within which 85.01% of sample means will fall.

1.36016 ÷ 2 = 0.68008

So the new lower limit is 58.31992

New upper limit = 59.68008

Correct answer is Option (E) None of the above

85.01% of sample means will fall within [58.31992 - 59.68008]

If approximated to 3 decimal places as in the options given above, 85.01% of sample means will fall within [58.320 - 59.680] inches.

GOOD LUCK!!

You might be interested in
Any factor that leads businesses to collectively expect lower rates of return on their investments ______ investment demand.
ANTONII [103]

Any factor that leads businesses to collectively expect lower rates of return on their investments <u>reduces investment </u><u>demand</u>.

The aggregate call includes consumption and funding demand. aggregate call for is the call for of total items and services in the economy as it is not possible to be counted all the bodily quantities the overall expenditure on all goods and offerings are taken into consideration.

Investment call for refers to the demand with the aid of corporations for physical capital items and offerings used to hold or extend its operations. Think of it because the workplace and factory space, machinery, computer systems, desks, and so forth might be used to operate an enterprise.

Funding is a part of combination demand; modifications in funding shift the aggregate call for curve by the amount of the preliminary exchange times the multiplier.

The question is incomplete. Please read below to find the missing content.

Any factor that leads businesses to collectively expect lower rates of return on their investments _____.

Multiple choice question.

A) reduces output

B) increases output

C) increases investment demand

D) reduces investment demand

Learn more about  demand here brainly.com/question/24384825

#SPJ4

7 0
2 years ago
How many points are in the LEED-NC rating system?<br><br> A. 21<br> B. 45<br> C. 69<br> D. 110
Lerok [7]
B is the answer I hope this helps
7 0
4 years ago
Read 2 more answers
) Market size and growth rates in different countries can be influenced positively or negatively by A. E) the absence or presenc
tatyana61 [14]

Answer:

B. A) population sizes, income levels and cultural influences, the current state of the infrastructure, and distribution and retail networks available. 

Explanation:

In a country where population is high, the demand for goods and services would be high and this would stimulate market growth. On the other hand, in a country where population is low, demand for products would be low and this can hinder market growth.

In a country where income level is high, demand for goods and services would also be high and this would stimulate market growth. The opposite is the case when income is low.

The presence of good infrastructure in a country enhances innovation and production and this can lead to market growth.

The presence of a strong and good retail network to enhance distribution of goods and services can lead to market growth as it assures producers of efficient distribution of goods and services produced.

I hope my answer helps you

3 0
3 years ago
The pro forma balance sheet shows how the __________ resulting from a strategic plan will be financed.
Lesechka [4]

Answer:

AFN

GIVE GOOD RATING AND THANKS FOR MY HARD WORK :)

6 0
3 years ago
What does NBT stand for?<br>For Life Orientation<br>​
expeople1 [14]

Demystifying the NBTs | National Benchmark Test Project.

5 0
3 years ago
Other questions:
  • Nathan is determining next year’s advertising budget by establishing specific marketing objectives, assessing the communication
    9·1 answer
  • Which of the following is not a common type of meeting?
    12·1 answer
  • Why would there be a problem within the team if there is an coworker displaying attitude and temper problems?
    8·1 answer
  • Harris Company had checks outstanding totaling $15,400 on its May bank reconciliation. In June, Harris Company issued checks tot
    13·1 answer
  • A.) Suppose that South Pangean debt is $100 million and the interest rate it pays on that debt is 4 percent. That means its inte
    11·1 answer
  • When customers have questions about a product they've purchased, or problems using it, they can go online to the company's websi
    11·1 answer
  • When comparison shopping, all of these hint at a good deal EXCEPT _____________________.
    5·1 answer
  • A project has an initial cost of $40,000, expected net cash inflows of $8,000 per year for 11 years, and a cost of capital of 10
    13·1 answer
  • In Waterway Company, Treasury Stock increased $20400 from a cash purchase, and Retained Earnings increased $80200 as a result of
    9·1 answer
  • Which action is an example of a short-term savings goal?
    8·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!