1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
igor_vitrenko [27]
3 years ago
14

A Quality Analyst wants to construct a sample mean chart for controlling a packaging process. He knows from past experience that

whenever this process is under control, package weight is normally distributed with a mean of twenty ounces and a standard deviation of two ounces. Each day last week, he randomly selected four packages and weighed each:Day WEIGHT (ounces)Monday 23 22 23 24Tuesday 23 21 19 21Wednesday 20 19 20 21Thursday 18 19 20 19Friday 18 20 22 20If he uses upper and lower control limits of 22 and 18 ounces, on what day(s), if any, does this process appear to be out of control?Question 1 options:MondayTuesdayMonday and TuesdayMonday, Tuesday, and ThursdaynoneSaveQuestion 2 (1.67 points)A Quality Analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results:Machine MeasurementsNumber1 17 15 15 17Number2 16 25 18 25Number3 23 24 23 22For upper and lower control limits of 23.29 and 16.71, which machine(s), if any, appear(s) to have an out-of-control process mean?Question 2 options:machine Number1machine Number2machine Number3all of the machinesnone of the machinesSaveQuestion 3 (1.66 points)A Quality Analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results:Machine MeasurementsNumber1 17 15 15 17Number2 16 25 18 25Number3 23 24 23 22What is the estimate of the process mean for whenever it is under control?Question 3 options:1619202123SaveQuestion 4 (2.5 points)Specifications for a piece of material used in the manufacture of a bed mattress require that the piece be between 52.47 and 55.53 inches. The process that produces the piece yields a mean of 54 and a standard deviation of 0.9 inches. The distribution of output is normal. What percentage of the pieces will meet the length specs?Question 4 options:4.45 %91.08 %97.85 %95.54 %None of the AboveSaveQuestion 5 (2.5 points)Specifications for a piece of material used in the manufacture of a bed mattress require that the piece be between a Lower and Upper value (in inches) centered around the process mean. The process that produces the piece yields a mean of 59 and a standard deviation of 0.8 inches. The distribution of output is normal. Within what values will 85.01 percent of sample means fall, if samples of n = 5 are taken and the process is in control?Question 5 options:58.484 , 59.51558.166 , 59.83357.847 , 60.15257.211 , 60.788None of the Above
Business
1 answer:
AlexFokin [52]3 years ago
6 0

Answer:

There are 5 questions altogether, so the answers and explanations are below.

Explanation:

QUESTION 1

Whenever the packaging process is under control, package weight is normally distributed with mean of 20 ounces and standard deviation of 2 ounces. This makes the true mean lie between 18 and 22 [subtract 2 from 20 and add 2 to 20].

For Monday, the mean is the addition of the values then divided by 4. That is, 92/4 = 23

For Tuesday, same computation follows. We have 84/4 = 21

For Wednesday, 80/4 = 20

For Thursday, 76/4 = 19

For Friday, 80/4 = 20

For the packaging process to be out of control, the mean weight for that day of the week must be outside the interval.

The answer is option (A) Monday because the mean weight for that day exceeds the upper limit of 22 ounces.

QUESTION 2

Accordingly, he sampled 4 units of output from each machine.

We will find the mean of the output units from each machine.

M1 : (17+15+15+17) ÷ 4 = 64/4 = 16

M2 : 84 ÷ 4 = 21

M3 : 92 ÷ 4 = 23

The correct answer is option (A) Machine Number 1 because the process mean for that machine is outside the control limit specified. The value 16 is below the lower limit value of 16.71.

QUESTION 3

It is the same as question 2 BUT we are to find the estimate of the process mean for whenever it is under control.

The interval given [16.71 - 23.29] represents the interval within which the process means for machines which are 'under-control' will fall. Hence the estimate of the process mean for whenever the machines are under control is:

(23.29 + 16.71) ÷ 2 = 40/2 = 20

The correct option is (C) 20

QUESTION 4

Specification requires that the piece of material be between 52.47 and 55.53 inches.

The process that produces the piece of material yields an interval of [53.1 - 54.9].

This is gotten from the subtraction of the standard deviation/error from the process mean of 54 and adding the standard error to the process mean of 54.

The answer is option (E) None of the above. This is because the correct answer is 100%. All pieces produced by the process fall within 53.1 and 54.9 inches and this interval falls rightly within the required specification of [52.47 - 55.53] inches.

QUESTION 5

Here, process mean interval is same as the required interval. Subtracting the standard deviation from the process mean and adding it to the process mean, we get our lower limit and upper limit respectively. The distribution of output is also normal.

Since the process is under/in control, it means that the 5 samples had sample means that are within the required interval.

So, since distribution of output (mean) is Normal, 85.01% of the sample means will fall within the middle values of 85.01% of the interval.

The interval spans 1.6 points or inches. This is the distance or difference between the upper and lower limits.

85.01% of 1.6 is 1.36016

We will divide this interval into two so we can get our new standard deviation and subtract it from 59, as well as add it to 59, to get the new interval within which 85.01% of sample means will fall.

1.36016 ÷ 2 = 0.68008

So the new lower limit is 58.31992

New upper limit = 59.68008

Correct answer is Option (E) None of the above

85.01% of sample means will fall within [58.31992 - 59.68008]

If approximated to 3 decimal places as in the options given above, 85.01% of sample means will fall within [58.320 - 59.680] inches.

GOOD LUCK!!

You might be interested in
Required: Accounting equation Ans: assets, capital, liabilities SE-2. You are provided the following information: i. Commencemen
Tasya [4]

Answer:

<h2> particular. l.f. Dr. rs. Cr. rs. </h2>

I) bank a/c. 1,00,00.

to capital a/c. 1,00,00

( being business started with bank balance)

II) purchase a/c 40,000.

to bank a/c. 40,000

(being goods purchased on credit)

III) BANK A/C 20,000.

TO GOODS A/C 20,000

(BEING GOODS SOLD ON CREDIT)

IV) FURNITURE A/C. 60,000.

TO BANK A/C. 60,000

(BEING FURNITURE PURCHASED ON CREDIT)

V) BANK A/C. 10,000.

TO FURNITURE A/C 10,000

(BEING FURNITURE SOLD ON CREDIT)

HOPE IT HELPS IM ALSO NOT COMPLETELY PERFECT AT IT

3 0
3 years ago
Why is it important to know the interest rate on your credit card?
Irina18 [472]
A

When you go into credit (the red) you basically loan money which means that you have to pay a "fine" called interest. so the more you loan and depending on the type of loan, the more interest you will pay.

3 0
3 years ago
Cyclical unemployment: a) rises during recession. b) falls during recession. c) rises during expansion. d) is a part of natural
dimulka [17.4K]

Cyclical unemployment: rises during a recession

<h3><u>What is Cyclical unemployment ?</u></h3>
  • Cyclical tendencies in growth and output, as shown by the GDP, that take place throughout the economic cycle are what are meant by cyclical unemployment.
  • Cyclical unemployment is defined by economists as the situation that arises when firms don't have enough demand for labor to hire all people who are searching for work at that particular stage of the business cycle.
  • There may be a commensurate decrease in supply output to make up for a loss in demand for a good or service.
  • To fulfill the lower norm of production volume, fewer workers are needed when supply levels are cut.
  • The corporation will discharge any employees who are no longer required, which will result in their unemployment.

To learn more about Cyclical unemployment, refer to:

brainly.com/question/14227610

#SPJ4

6 0
1 year ago
In his speech, George plans to convince his audience to buy a refillable water bottle instead of disposable water bottles. What
Natasha2012 [34]

Answer: Persuasion

Explanation: Persuasion can be define as the act of influencing someone or changing their mindset. In such case, the one persuading other must have his own mind set.

In the given case, George wants the audience to change their mindset of using plastic bottles as they are harmful for environment.

Thus, from the above we can conclude that the purpose of George behind his speech is persuasion.

5 0
3 years ago
The asset/liability approach emphasizes: Multiple Choice Whether amounts on the balance sheet meet the definitions of assets and
attashe74 [19]

Answer:

Whether amounts on the balance sheet meet the definitions of assets and liabilities

Explanation:

The asset/liability approach emphasizes whether amounts on the balance sheet meet the definitions of assets and liabilities. It is a process of managing the use of assets and cash flows to reduce the firm's risk of loss from not paying a liability on time. Well-managed assets and liabilities increase business profits. A contract generates assets and liabilities, and the goal is to depict them in the statement of financial position.

4 0
3 years ago
Other questions:
  • Suppose you and a classmate are playing a game where your classmate proposes a division of​ $1.00. ​ Then, you either accept or
    13·1 answer
  • Why does pizza have pepperoni
    9·2 answers
  • Which is the best answer
    15·1 answer
  • Following a technological decline—for example, a decrease in the speed with which robots can attach bolts to cars—there is a the
    10·1 answer
  • Jessica is a U.S. Army Reservist and in 2019 traveled 130 miles each way to serve duty at a local military installation. She was
    7·1 answer
  • MC 1
    8·1 answer
  • Please help its due in 2 hours time will give all my points
    6·1 answer
  • Which of the following is a reason you can be fired under an employment at
    13·1 answer
  • Why are business office established​
    12·1 answer
  • There can be many departments or just a few when _____ a business.
    5·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!