The examples of engineering controls is Biohazard waste containers and Spill clean up kits.
What is engineering controls?
An engineering controls is a workplace process that protect workers by removing hazardous conditions or by placing a barrier between the worker and the hazard.
An example of engineering controls is installation of exhaust ventilation to remove airborne emissions to shield the worker.
Hence, the examples of engineering controls is Biohazard waste containers and Spill clean up kits.
Therefore, the Option C and D is correct.
Answer:
$151094
Explanation:
Solution
Recall that:
Acme Chemical in 2002 purchased a large pump worth of = 112,000
The estimation for the pump to the industrial pump index is =100
The index in 2002= 212
The current index is = 286
k = is the reference year for which cost or price is known.
n = the year for which cost or price is to be estimated (n>k).
Cn = the estimated cost or price of item in year n.
Ck = the cost or price of item in reference year k.
Cn = Ck * (In / Ik )
Now,
We find the estimated cost of the new pump which is stated as follows:
Cn = (112,000 * 286) /212
=32032000/212
=$151094
Therefore, the estimated cost of the new pump is $151094
Answer:
The line voltage of the three phase network is 346.41 V
Explanation:
Star Connected Load
Resistance, R₁ = R₂ = R₃ = 18 Ω
For a star connected load, the line current = the phase current, that is we have

Whereby the the voltage across each resistance =
is given by the relation;
=
× R
Hence;
=
=
× R = 25 × 8 = 200 V
Therefore we have;
The line voltage,
= √3 ×
= √3 × 200 = 346.41 V.
Hence, the line voltage of the three phase network = 346.41 V.