Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.
Answer:
A. True
Explanation:
Websites are created using html, css, javascript and other web based programming languages. When a website page is requested, the host server sends the copy of the source code to the web browser of the client system, the web browser is able to interpret the source code and displays the graphical representation on the web browser for the client.
Answer:
factors such as low literacy and income level Geographical restriction lack of motivation motivation of the technology lack of motivation to use technology and digital illiteracy and contribute to the digital device
Answer:
11. 3 dimensions
12. ( i believe its number 3)
13. 2 option
14. Natural Light
15. Development
Explanation:
The German mathematician & physicist ”Carl Friedrich Gauss”
Born: April 30, 1777, Brunswick, Germany
Died: February 23, 1855, Göttingen, Germany