Answer:
С. $1,350.00 Favorable
Explanation:
The computation of the material price variance is shown below:
= Actual Quantity × (Standard Price - Actual Price)
= 9,000 × ($19.15 - $171,000 ÷ 9,000)
= 9,000 × ($19.15 - $19)
= 9,000 × $0.15
= $1,350 favorable
The actual price is computed below:
= Actual cost of materials purchased ÷ Actual materials purchased
= $171,000 ÷ 9,000
= $19
Prior to closing, a final walk through of the property should be performed to ensure that everything has remained as stated in the sales contract. The walk through is generally completed by the: buyer
<h3><u>
Explanation:</u></h3>
In real estate field final walk through refers to the inspection that is carried out finally before signing the documents. The local purchase and sales contract determines the time period at which the final walk through must be taken place. It helps the buyer to ensure the conditions to the property before signing the legal documents.
A final walk through helps a buyer to inspect whether all the things that are stated in the sales contract are fulfilled by the seller. Hence, it must be completed only by the buyer. If the seller has mentioned some modifications or repairs to be done then it should also be completed as per the stated requirements of the buyer.
Answer:
The answer is d) new line-extension product
Explanation:
A new line-extension product, is a variation of the original product. The company did not entirely change their product they just tweaked it; they branched out.
Answer:
Total overhead= $39,900
Explanation:
Giving the following information:
Variable manufacturing overhead $1.90
<u>First, we need to calculate the total fixed overhead:</u>
Total fixed overhead= 7,800*3.8
Total fixed overhead= $29,640
<u>Now, the total overhead for 5,400 units:</u>
Total variable overhead= 1.9*5,400= 10,260
Total fixed overhead= 29,640
Total overhead= $39,900