Answer:
y = 50x + 3.5
Step-by-step explanation:
Given:
Distance already covered = 3.5 miles
100 miles covered in 2 hour
FInd;
Equation of given scenario
Computation:
Assume;
Total miles covered = y
Total number of hours = x
Speed of car = 100 / 2
Speed of car = 50 miles per hour
Total miles covered = Distance already covered + [Speed of car][Total number of hours]
y = 3.5 + [50][x]
y = 50x + 3.5
Yes because 3² + 4² = 5²
to be sure
9 + 16 = 25
25 = 25
Lynne ran farther and by 7/8 miles
You can tell Lynne ran further because she ran 3 whole miles while shelly only ran 2 whole miles. Now you have to subtract to see how much Lynne had ran more.
You found a common denominator between 8 and 4. 4 can turn into 8. so you multiply 4x2 and 1x2 to get a mixed number of 2 2/8
Now you have to turn 3 1/8 because you cannot subtract 2/8 from 1/8. You can turn the fraction into 2 9/8 because there are 8 pieces in a whole.
2 9/8 - 2 2/8 = 0 7/8
Hope this helps! :)
Answer:
The maximum height of the ball is 256m
Step-by-step explanation:
Given the equation of a pathway modelled as pathway can be modeled by h = -16t² + 128t
At maximum height, the velocity of the ball is zero.
velocity = dh/dt
velocity = -32t + 128
Since v = 0 at maximum height
0 = -32t+128
32t = 128
t = 128/32
t = 4seconds
The maximum height can be gotten by substituting t = 4 into the modelled equation.
h = -16t² + 128t
h = -16(4)²+128(4)
h = -16(16)+512
h = -256+512
h = 256m
Answer:
Step-by-step explanation:
A) Use the slope formula to find the slope m.
m=4/13
B) Use the point-slope formula, y−y1=m(x−x1) to find the equation of the line.
y=4/13x+198/13
C) Write in slope-intercept form, y=mx+b.
y=4/13x+198/13