Input m = -4 n = 2 and p = 1.5 into the expression above
7m + 2n - 8p/n
= 7(-4) + 2(2) - 8(1.5)/2
= -28 + 4 - 6
= -30
Answer:
30 trees/acre
Step-by-step explanation:
Let n = the number of trees added to 1 acre
Let Y(n) = the yield in bushels/acre
Yield in bushels/acre = [bushels/tree] x [trees/acre]
Y(n) = (40-n)*(20+n)
= 800 - 20n + 40n - n^2
= n^2 + 20n + 800 ---------------------(1)
The n-value of the vertex ( which is a peak ) is given by the formula:
n(max) = -b/2a
Putting values from equation (1) gives us
n(max) = 10
The grower started with 20 tree/acre and adds 10 more for max yield, so she should plant: 30 trees/acre
and
Maximum yield is 900 bushels/acre.
Answer: The answer is a parallelogram! I hope this helps you!!
Step-by-step explanation: If only one pair of opposite sides is required to be parallel, the shape is a trapezoid. A trapezoid, in which the non-parallel sides are equal in length, is called isosceles.
When you multiply two powers of the same base, you sum the exponents:

So, in this case,

Now, negative exponents works like positive exponents, except you have to invert the number: i.e.

So, you have

Answer:
4 + 2/3 hours
Step-by-step explanation:
For the expert,
6 hours = 1 job
For the secretary,
7 hours = 1 job
We want to figure out how much the expert gets done in 2 hours.
2 hours = x jobs for the expert.
To turn 6 hours = 1 job into this, we can multiply both sides of the equation by 2 (the number we want to get to) / 6 (the number we are at) to get
6 hours * 2/6 = 1 job * 2/6
2 hours = 2/6 jobs
Therefore, the expert does 2/6 of the job, and 1-2/6 = 4/6 of the job is left for the secretary. We want to figure out how long it takes for her to complete the job
We know
7 hours = 1 job
and want to figure out
y hours = 4/6 jobs
We can multiply both sides of the original equation by (4/7) (the number we want to get to) / 1 (the number we are at) to get
7 hours * 4/6 = 1 job * 4/6
28 /6 hours = 4/6 jobs
= 4 + 4/6 hours
= 4 + 2/3 hours