Answer:
b. P2 requests drive 2 and gets it.
Explanation:
Two users from the local board of education are each running a program (P1 and P2), and both programs will eventually need two DVD drives to copy files from one disc to another. Only two DVD-R drives are available and they’re allocated on an "as requested" basis. Soon the following sequence transpires: P2 requests drive 2 and gets it.
I am not too familiar with the Python language, but the algorithm would be something like this:
1. create a variable for the sums of the number
2. read in how many numbers the user wants to enter (let's call it N)
and then create a for loop:
for N times
read in the next number
increase the sum variable by that number
Hopefully this helps!
Answer:
D. The need to slow down more often in life.
Answer:
scheduling
Explanation:
Scheduling- it is referred to as assigning a task to complete the goal or work on time. he works can include data flow, processing of data, etc.
There are two main types of scheduling
1) Preemptive process
2) Non- preemptive process
Preemptive process - in this process, priority is given to important tasks rather than less important tasks. the current task can be held for an important task
Non-preemptive process - It is referred to that process when the predefined schedule follows. In this process, next task executed only when current task finish
<span>Instance variables are declared private to prevent direct modification. Access to the variables is instead provided through methods. This practice is known as..
</span><span>c. encapsulation. It </span><span>is a mechanism of bundling the data (variables) and code acting on the data (methods) together as one.</span>