Answer:
109.2-23.6 = 85.6
Step-by-step explanation:
use bodmas
B=bracket
O=of or multiplication
D=division
M=multiplication
A=addition
S=subtraction
so when you are opening a bracket you multipli the number in the bracket with the one outside the bracket
I.E
4×27.3=109.3
4×5.9=23.6
109-23.6=85.6
Answer:
1. Evaluate 3y - 4 for y =5
3*(5)-4=15-4=11
2. 65 + x = 99 x = ?
65+x=99
x=99-65
x=34
3. Find the product. 38.7 *21
38.7*21=812.7
4. Which value satisfies the equation? 9x + 3 = 30
The right value for x would be:
9x+3=30
9x=30-3
9x=27
x=27/9=3
Step-by-step explanation:
If you assume doubling the workers will halve the time taken to finish then 12 analysts will take 21 days
To finish in 7 days (1/6 of 42 days) you would need 6 x the original number = 36 analysts.
Brook’s Law (see Wikipedia) suggests than adding extra analysts will actually slow the project down!
One reason is the extra people tend to get in each others way.
I'm assuming that subtraction sign is mean to be an equals sign. If that is true than the answer is 403.75.
The equation has one solution, x = -7.